Loading…
Loading…
381 results • Recent activity
Dismantling and Laying of M.S. Pipeline ranges of 6 inch and 4inch diameter for firefighting at different coal stocks of. at Kulda OCP for 365 days at Basundhara Area.
Strengthening, overhauling and renovation from time to time of all the Weighbridges, including testing of the same with test weights as and when required for a period of two years for Kulda OCP Basundhara Area
Day to day works related to dismantling, shifting, laying, fitting, commissioning, installation of pipelines of sizes 200mm,250mm and 300mm in the mines for dewatering etc as and when required basis for the period of 365 days at Kulda OCP, Basundhara
Repairing of 5 Nos. Tower AC of capacity 4 Ton installed at Officers club under Rampur Sub Area of Orient Area.
Laying fitting MS or HDPE pipe 8inch or 10inch dia vertically from Quarry pump to discharge point at North OB Bench side and dismantling old range with extension of 2 range partially at Quarry LOCP, IB Valley Area
Transformer Oil filtration with cleaning of different capacities of power, distribution and lighting transformers of LOCP, IB Valley Area