Loading…
Loading…
794 results • Recent activity
Special repairing of Strong room and VVPT Room (Room No. 19, 19A) inside the administrative office Building North 24-Parganas during the year 2025-26.(SL NO 02)
Sludge cleaning of Cross drainage works at different locations from 0.00 km to 13.00 km repairing of drain in between 9.00 to 10.00 km (L/S) of Ghoshpara road under Barrackpore Division, PWD in the District of North 24 Parganas durinfg the year 25-26
Repairing and Painting work of Room no-48 at the 1st floor of Administrative Building, under Barrackpore Division PWD, during the year 2025-26.
Construction work for new Electric Meter Room for WBSEDCL at W.B.N.V.F. Training Centre, Halisahar.(SL NO 01)
Providing barricading on road side footpath of B T Road for safety to the pedestrians During the forth coming Durgotsav 2025 under Kolkata North Division in the District of North 24 Parganas
Restoration of Earth Shouldering related to cutting (Open Trench) of Ghoshpara Jaguli Road from 5.80 KM to 7.80 km (R/S) for lying of underground Cable by WBSEDCL during the year 2025-26.(SL NO 03)