Loading…
Loading…
834 results • Recent activity
Repair and renovation of Poultry Layer Shed 5 and some allied works at State Poultry Farm Gobardanga, North 24 Parganas under Barasat Division PWD
Kholapota-Baduria-Maslandapur-Habra-Road-Surfacing Work from chainage 17.40 Km to 24.40 Km (except length of 130.00 m at Maslandapur railway Level Crossing) under Barasat Division in the ditrict of North 24 Parganas
Urgent restoration of Jetty no-5 by taking anti erosion measures at river Muriganga Right embankment, mouza- Kashtala under Sagar (I) Sub Division of Kakdwip (I) Division icw G.S MELA 2026
M/R to damaged block pitching of the existing embankment for a length of 120 m at LoT-8 facing left bank of river Muriganga at Mouza- Kalinagar, Block- Kakdwip, Dist. South 24 Parganas- under Kakdwip Irrigation Division i.c.w. G.S. Mela-2026
Construction of Brick Paved Pilgrim Road at Chilchili for a length of 0.37 K.M. at NamkhanaPoint within Block-Namkhana, Dist.-South 24 Parganas under Kakdwip Irrigation Division i.c.w. G.S. Mela-2026
Supply and installation of sign board marking different dyke at Lot-8 in connection with GS Mela-2026 within the jurisdiction of Kakdwip Irrigation Division