Loading…
Loading…
834 results • Recent activity
Emergent restoration of Sundarban Embankment damaged during Full Moon Kotal on and from 04.11.2025 to 07.11.2025 for a length of 80.00 M near H/O Sk Abu Bakkar at Mouza Baliara facing Bay of Bengal under Mousuni Irrigation Sub- Division
Emergent restoration to Sundarban Embankment damaged during Full Moon Kotal from 04.11.2026 to 08.11.2026 for a length of 210.00 m from Ch.6.700 KM to Ch.6.910 KM at mouza Lakshmipur, facing the left bank of river Hooghly Block-Kakdwip
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on and from 04.11.2025 to 07.11.2025 for a length of 110 m inbetween Ch. 21.20 km and Ch. 21.34 km facing river Curzon creek in mouza-Krishnadaspur under Patharpratima
Emergent restoration of damaged sundarban embankment damaged during Full Moon Kotal on and from 04.11.2025 to 07.11.2025 along with low pressure depression in between Ch. 0.60Km and 0.68Km. for a length of 75m at mouza Gobardhanpur
Emergent restoration of 1 no Ghoge of Sundarban embankment damaged due to Full Moon Kotal on and from 04.11.2025 to 07.11.2025 in between Ch.18.95 km and Ch. 19.00 Km at Mouza Bhagbatpur facing river Gazir Khal under Patharpratima Irrigation
Emergent restoration of Sundarban Embankment damage ( 2 nos Ghoge) due to Full moon kotal on and from 04.11.2025 to 07.11.2025 near House of Ranjit Dolui facing river Edward Creek (R/B) at mouza -Shibrampur under Mousuni (I) Sub - Division