Loading…
Loading…
3,816 results • Latest
First Time Repairing of the Following 23 No Stoppings of CM Panel 25B and 8R 7L and 9R 7L and minus 21L 12D of Panel 27 at R VI Seam at MIC Unit
Eimco make SDL Machine No 1831 dismantling transporting and lifting from Tilaboni colliery underground section to surface and transporting the same at Bankola Colliery no 8 pit surface an lowering the same SDL 8 no pit surface to pit bottom an tra
making of gun metal bush for head gear pulley of pit no. 2 and pit no. 3 of Shyamsundarpur Colliery under Bankola Area
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Repair cum maintenance of the 8 inch and 10 inch MS pipes in the delivery side of the 2500 GPM pump in operation at the Deep mine zone at ROCP mine wrt ROCP ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Making of two nos of complete base plate of two nos of pump motor sets in operation of the intermediate sump in RJML OCP; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal mines; Complete repairing rewinding of 315KVA 6600V/440V oil cooled lighting transformer of Rajmahal OCP serial no ROCP EnM xmer 315/01; Service Provider