Loading…
Loading…
3,784 results • Latest
Re-Construction One (01) no. Electric substation at 9D/24L-25L in R-III/II seam of Khottadih Colliery, Pandaveswar Area
Repair of 02 (Two) nos. Aircrossing 4L/4D and 4L/5D in R-IV Seam of Khottadih Colliery, Pandaveswar Area
Repairing 15 (Fifteen) nos. Sectionalization Stoppings at 25L to 29L/11D-12D and 30L-39L/8D-9D in R-IV Seam of Khottadih Colliery, Pandaveswar Area
Construction of 06 (Six) nos. Retaining Wall in R-VI Seam of Khottadih Colliery, Pandaveswar Area
Concreting along New Incline from 120m to 210m at Khottadih Colliery, Pandaveswar Area.
Construction of 17 nos Isolation stopping for proposed depillaring panel, which is beside depillared panel C-13 in R-V Seam of No.5 pit at Manderboni South Samla Amalgamated Colliery under Pandaveswar Area