Loading…
Loading…
3,788 results • Latest
Complete repairing and overhauling of A/Y make 200 Amps 550Volt FLP ACB and Weikel make Switch of 200 Amps 550Volt FLP ACB Shyamsundarpur Colliery
Transportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor set at 20XD 67L along with its 4 inch dia pipeline from 20XD 67L to 7XD sump in RVII seam at 3N4 Incline Unit Jhanjra Project Colliery
Installation of one Roto pump at 25D/ 2L and installation of one no 660M 3in dia MS pipe line at MIC, JPC
Transportation installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation-installation of tail end unit along 74L for further development of Panel-10 in R-VIIA seam by LHCM-1 at 3N4 Incline, J.P.Colly.
Transportation, installation, necessary fabrication, commissioning trial run of one no. 1000 mm width, 1x90kW, 550V, single drive belt conveyor along 4D from 80L to 85L in R-VIIA seam at 3n4 Incline, J.P.Colly.
Pillars shortening from -1D 80L to -6D 80L re fitting of 5 pillars structure from -6D 80L to 1D 80L of 1000mm 80L belt conveyor of LHCM-1 section in R-VIIA seam at 3n4 Incline, JPC