Loading…
Loading…
3,759 results • Latest
Construction of wharf wall and side drain at Railway siding at Bhanora Colliery under Satgram-Sripur Area(Re-Tender)
Construction of one no. Diesel Pump room at Kalidaspur Project
Construction of retaining wall south side of Lalkiband at Dakaita rehab site under Rajmahal Area.
Transferring EIMCO Make LHD No. 1007 from Shyamsundarpur Colliery to Shankarpur Colliery.
BEARING BALL, 6313, DP GRV SNGL, 65 MM, BEARING BALL, 3313, ANCLR CNTCT, DBL, 65MM, DIODE, BY 127, SILICON, SET OF TWO BEARING BUSHES, NECK RING WITH SCREW, VLCNZD TAPE RUBBER 50 MM, ENCLOSED IMPELLER, MAIN SHAFT, STATOR, FUSE CRTRG, HT, 2A, 3.3 KV, PLANETARY PINION 28T, 1ST DRIVEN GEAR - 72 T
DISCHARGE ROD 33KV, MAT INSLTD RBR, 1M, 2M, 2.5MM 11KV, LONG RBR GLOVES, HOSE RBR, 150MM, DBL ARMRD, FLNGD BTH END, LDDR EXTN FBR GLS, 18-32FT, SLF SUPRTG