Loading…
Loading…
1,539 live528 closing this weekmost from Eastern Railway and Indian Railways
1,539 results • Latest
AIR BRAKE HOSE COUPLING COMPLETE FOR FEED PIPE ( OF LENGTH 790 mm ), CONFORMING TO APPENDIX -F OF RDSO SPEC. NO. 02-ABR-02, Amendment- no. 4 of Sept. 2016.
DOOR CONNECTING SHAFT As PER DRG. No. SK-77550, ITEM No. 6 WITH COLLER, WASHER & KEY.
25KV OHE Modification work in connection with Extension of FOB at BWN station in Howrah Division of Eastern Railway.
25KV OHE Work in connection with Provision of passenger lifts connecting to FOB at ABKA, NDAE, KWAE, AZ,KGLE,HWH,DKAE,TAK,SNT,LLH,BDC,KQU,SALE,BOI,PDA & MYM over Howrah Division OF Eastern Railway.
Electrical wiper motor linkage for non-driver side of MEDHA 3 phase rakes.
Electrical wiper motor linkage for driver side of MEDHA 3 phase EMU rakes.
TUBE STEEL SEAMLESS HEAVY GRADE NOMINAL BORE 32MM BLACK PLAIN ENDS Etc.
Procurement of xxHEX HEAD BOLT M 16 X 70 MM etc.
One set of Hardware items for LHB EOG Coaches with air spring suspension
Procurement of Liquid Oxygen as per IS: 309/2023 5th Revision, Purity minimum 99% by volume.