Loading…
Loading…
10 results • Recent activity
Providing manpower services for operation and maintenance of switchyard at Punadi Lift Irrigation Scheme Stage 1_2 and 3 and 33 KV line from Stage 1 to 2
Supply erection testing and commissioning of 33_6.6 KV 2.5 MVA Power transformer at Pundi Stage II for Second Bay
Design Supply Erection Testing and Commissioning of switchyard of capacity 33/6.6 KV for Stage 1 33/11 KV for Stage 2 and 33/11 KV for Stage 3 along with allied 33 KV transmission lines for Mhaisal Extended Jath Lift Irrigation Scheme Dist. Sangli
Supply erection testing and commissioning of 11 KV Transmission line from 11 KV MSEDCL Parale Kodali Line Tapping Point To Tilari Chowk Sub Station for Tillari Dam Colony and 3 Phase 5 Wire LT Line for water supply arrangement at Tillarinagar