Loading
Loading…
Loading…
3 results • Latest
Overhauling(POH) of Oil Free Compressor(Capacity1750 LPM)
Supply of material & Installation of thermal cum sound insulation for driver cab for WAP-7/WAG-9HC/WAP-5 Locomotives as per CLW SPEC NO.CLW/MS/3/160 ALT.NIL.
01) Stripping Pn valves with reservoirs/tri-plate (E-70) Pn panel, attending, Fitting and Pn pressure testing of all type of three phase electric locomotives as per RDSO specification at ELW/BSL. 02) Stripping Pn valves with reservoirs/tri-plate Pn panel, attending, Fitting and Pn pressure testing of all type of conventional electric Locomotives fitted with tri-plate Pn panel only as per RDSO specification at ELW/BSL.