Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5239G Work of dismetalling Erection fitting installation and trial work of various heavy parts Auxiliaries of Wagon Tippler installed in Coal Handling Plant at Ukai TP..
Handling and Transport on Lumpsum Basis - WT 5223G Biennial Rate Contract for collecting loading transporting and unloading of reject coal from bowl mill area and R C Feeder of unit No 3 to 5 at TPS Ukai BMD 2
GeMService Bid/RAsServicesHandling and Transport on Lumpsum Basis - WT 5223G Biennial Rate Contract for collecting loading transporting and unloading of reject coal from bowl mill area and R C Feeder of unit No 3 to 5 at TPS Ukai BMD 2
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5241G Various routine and preventive maintenance works of conveyor system at coal handling plant I and II TPS UKAI on as and when required basis; As per Schedule B and..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5235G Work contract for various job works pertains to Chemical Laboratory UTPS as and when require basis Chemical Lab; Power House Equipment, As per ATC; As per ATC
ET-6359_ Supply For M. S R/L Caustic Bulk Tank And Sodium Sulphate Tank For BMD- 3, 4 & 5 At Ukai TPS, ( 2 the number pi ), ET-6359_ M. S R/L Caustic Bulk Tank And Sodium Sulphate Tank For BMD-3, 4&5 At Ukai TPS, GSECL. ( 3 the number pi )
GeMProduct Custom Bid/RAsGoodsET-6359_ Supply for M. S R/L Caustic Bulk Tank and Sodium
Facility Management Services - LumpSum Based - Residential; Pest Control Service; Consumables to be provided by service provider (inclusive in contract cost)
GeMService Bid/RAsServicesFacility Management Services - LumpSum Based - Residential; Pest Control Service; Consumables to be provided by service provider (inclusive in contract cost)
Revolving Chair (V5) (Q2) ( PAC Only ), Revolving Chair (V5) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2), Heavy Duty Refrigerant Copper Pipe of Size: 5/8", Heavy Duty Refrigerant Copper Pipe of Size: 1/4"
GeMProduct Custom Bid/RAsGoodsSplit Air Conditioner, Wall Mount Type (V3) ISI Marked to IS
Erection, Commissioning, And Testing Of New Charger And Decommissioning & Removal Of The Existing ( 2 the number pi ), 220V SMPS BASED BATTERY CHARGER SYSTEM RATINGS: 220VDC/70A FC+ 105A FCBC BATTERY CHARGER WITH 415 ( 2 the number pi ), Erection, Testing And Commissioning Of 220V DC 375AH, Ni-Cd Type Battery Set Including Dismantling ( 2 the number pi ), 220V DC, 1.2 CELL VOLTAGE, 375AH NICKEL CADMIUM TYPE BATTERY SET WITH 15 SPARE CELLS, STANDARD ACCES ( 2 set )
GeMProduct Custom Bid/RAsGoodsErection, Commissioning, and Testing of new charger and
LP(P) -2703: IL MAKE PNEUMATIC REGULATING POWER CYLINDER ACTUATOR MODEL: PCD 08 X 16, IL MAKE PNEUMATIC REGULATING POWER CYLINDER ACTUATOR MODEL: PCD 06 X 08, IL MAKE PNEUMATIC REGULATING POWER CYLINDER ACTUATOR MODEL: PCD 04 X 08
GeMProduct Custom Bid/RAsGoodsLP(P) -2703: IL MAKE PNEUMATIC REGULATING POWER
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5227G Work of OH lifting shifting of various sizes of LT motors and MOV Electrical actuators installed in unit no 6 during running of Unit emergency as and when avai..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW125G Biennial Rate Contract for the work of Transformer Oil sample collection and Transportation charges by Ms ERDA Vadodara for GSECL HPS Ukai for the year 2027 29 EM..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5247G (Workshop) Works for attending puncture leakages and replacement of various sizes Service Fire Emulsifier water pipe line and fabrication work at Unit No 3 to 6..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5211G Work of servicing of various gear box of ESP and Wall blower/LRSB of Unit no-6 Ukai TPS on as and when required basis (BMD-6); WT-5211G Work of servicing of var..
Turbine Bottom Shaft Seal MOC: Neoprene Rubber, Size: ID 1000 x OD 1195 x 6 mm Thick, PCD: 1130 wit, Turbine Top Shaft Seal MOC: Neoprene Rubber, PCD: 1130 with 24, Isolating Seal with Air Pipe as per attached drawing, Material: Neoprene Rubber, Shore Hardness: 65
GeMProduct Custom Bid/RAsGoodsTurbine Bottom Shaft Seal MOC: Neoprene Rubber, Size: ID
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5232G the work of rectification and restoration of boiler roof top at 64 meter in Boiler Unit Nos 3 to 5 at GSECL Ukai TPS BMD 2; As per Schedule B and scope of work m..
AMC of Integrated Security and Surveillance System - WT- 5240G Work of Comprehensive Annual Maintenance Contract CAMC of IP based CCTV Surveillance System installed at Ukai Thermal Power Station (IT); Comprehensive; As Per ATC; Consumables to be provi..
GeMService Bid/RAsServicesAMC of Integrated Security and Surveillance System - WT- 5240G Work of Comprehensive Annual Maintenance Contract CAMC of IP based CCTV Surveillance System installed at Ukai Thermal Power Station (IT); Comprehensive; As Per ATC; Consumables to be provi..
Repair and Overhauling Service - Computer Printers; WT- 5225G Providing of Recycled Laser Printer Toners against empty Toners at GSECL Ukai IT; Yes; Service Provider Premises
GeMService Bid/RAsServicesRepair and Overhauling Service - Computer Printers; WT- 5225G Providing of Recycled Laser Printer Toners against empty Toners at GSECL Ukai IT; Yes; Service Provider Premises
Custom Bid for Services - Mechanical Piping and Handrailing Fabrication & Erection Works Similar Category Piping Erection Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
GeMService Bid/RAsServicesCustom Bid for Services - Mechanical Piping and Handrailing Fabrication & Erection Works Similar Category Piping Erection Service Repair