Loading…
Loading…
387 results • Latest
Wireless Remote Rackin device
Multifunction Printer (Print, Scan, Copy) (Q2) ( PAC Only ) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; HP & LP BYPASS Valves Servicing in AOH of Unit # 4 - 2x660 MW Unit; Service Provider
SS PIPE OD-624MM, FOR CENTRE FEED PIPE
Ammoniasolution25% (Q3)
150200020036 - FRF OIL RECONDITIONING MACHINE 20 LPM, 150200020037 - A - FIBER GLASS FILTER 10 AND 3 MICRON SET, 150200020038 - A - ION EXCHANGE RESIN FRF OIL MACHINE, 150200020037 - B - FIBER GLASS FILTER 10 AND 3 MICRON SET, 150200020038 - B - ION EXCHANGE RESIN FRF OIL MACHINE
Supply of Various BHEL
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
Testing of Water Quality - Water for Industrial Purpose; Chemical Analysis of Turbine/Boiler deposition sample Cation Resin & Anion Resin DMP Water samples & Boiler water samples
150190240009 - STUD BOLT IPSV P0037633600 M90X6X12, 150190240010 - CAP NUT IPSV PM0A66F69A62 M90X6X22, 150190240011 - STUD BOLT IPCV PSK053Q394 M72X6X12 - A, 150190240012 - CAP NUT IPCV PM0A66F69B53 M72X6X22 - A, 150190240011 - STUD BOLT IPCV PSK053Q394 M72X6X12 - B, 150190240012 - CAP NUT IPCV PM0A66F69B53 M72X6X22 - B
CAST BASALT PIPE
Stainless steel shim(NHPC) (Q3)
Lighting Poleor Postand Hardware-Tubular Street Light Poles (V2) (Q3)
Customized AMC/CMC for Pre-owned Products - RTDAS device; rockwell; Annual Maintenance Contract (AMC); Monthly; Yes
Girth Gear Lubricants
Sulphuricacidfor Bulksupply-FACTL (Q3)
Industrial Strainer (Q3)
CONTROL VALVE SPARES FOR BHEL MAKE 660 MW TURBINE
SS PIPE OD-18MM, THICK 3MM For OIL LINE, SS PIPE OD- 25MM, THICK 3MM For SONIC BLOWER, SS PIPE OD 624MM, For CENTRE FEED PIPE, CS Seamless pipe OD 10X Thickness 1.5, CS Seamless pipe OD 28X Thickness 3, CS Seamless pipe OD 25X Thickness 4, CS Seamless pipe OD 16 X Thickness 2.5, Pipe CS Seamless 89 OD X 15.24mm THK, CS Pipe 18 OD X 1.5 MM THK, CS SEAMLESS PIPE O.D 12 x 1.5 THK
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; TSI System; Buyer
Plastic Chairs For General Purposes conforming to IS 13713 (V3) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2), Executive Table (V4) (Q2)
Aluminium Conductors for Overhead Transmission Purposes (Powergrid) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Stitching Wire for Book Binding (Q3)
Ceramic fiber cloth (RINL) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7048292 Dated : 27-12-2025 Bid Document 1/6 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
FEEDBACK ROD, HAD 336 50, Part No 89, SERVO VALVE ASSY, BUSHING, Part No 53, RING, HAD 336 50 Part No 56, GUIDE SLEEVE, Part No 2, Slide Carriage, Part No.18.088, END BUSHING, Part No 91, LEVER, Part No 82, BUSHING FOR CYLINDER COVER HAD 336 50, SNAP RING, HAD 336 100, Part No 71, SLEEVE, Part No 69, Part No 60, COVER BUSHING, Part No 75, SPACER, HAD 336 100 Part No 61, BUSHING F HYDRAULIC CYLINDER, HAD336 100
Revolving Chair (V5) (Q2) ( PAC Only ), Chair for General Purpose (Q2) ( PAC Only ), Modular Extendable Conference Table (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Electric Hoist (Telpher) as per IS 3938 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
Hiring Of Agency For ISO Certification Service - ISO 27001 - Information Security Management System (ISMS); Re- certification Audit; As per the Scope of work
Facility Management Services - LumpSum Based - Healthcare; Patient Support Services; Cost of consumable to be reimbursed to service provider on actual
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment; Service Provider
Ion Chromatography System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Customized AMC/CMC for Pre-owned Products - 0; Hitachi; Annual Maintenance Contract (AMC); Quarterly; Yes
Heater Elements (Q3)
FILLER WIRE
Line Operated Three Phase AC Motors ISI Marked to IS 12615 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7062123 Dated : 02-01-2026 Bid Document 1/9 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Line Operated Three Phase AC Motors ISI Marked to IS 12615 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 394848 Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4)
Submersible Sewerage Pump (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 4, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2026/B/7088111 Dated : 08-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
146651600001 - FLEXIBLE COUPLING F, 146651600005 - A - GRID SPRING FOR MILL COUPLING HP1103, 146651600007 - A - MILL MOTOR COUPLING FREE HUB, 146651600005 - B - GRID SPRING FOR MILL COUPLING HP1103, 146651600007 - B - MILL MOTOR COUPLING FREE HUB
Professional Painting Service - Metals; NA; Epoxy painting of Stacker & Re-claimer of #CHP-I, OPGC
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT, Mechanical, Radiological, NDT SERVICES (RT, SR, PAUT, IOT & Boroscopic Inspection) IN BOILER DURING AOH OF Unit#4, FY 2026-27; NDT SERVICES (RT, SR, PAUT, IOT & ..
60 Kg GRS Pad for 1 in 8.5 P and C, RT-4965, 60 Kg GRS Pad for 1 in 12 P and C, RT-4218, Steel channel sleeper fittings, BA1636 1 R2, Nut for 28mm dia hookbolt Galvanizing, Tappered Split pin 5mmx75 mm of28 mmbol, CMS Crossing for1in 8.5 P and C, RT4967, 60Kg, Switch for1 in 8.5 P and C, 60 Kg Rail RT4966, Switch for 1 in 12 P and C, 60 Kg Rail RT4219
Clinker Grinder Gear Box, Output shaft, External circlip complete set, Internal circlip, Spacer complete set, Single piece gear case cover, Input cover for solid Input shaft, Gear case, Oil level Indicator, Pinion oil, wheel first, Helical pinion shaft second stage, Helical wheel for Output shaft, Solid input shaft
Hydrated Lime for Bulk Supply as per IS 1540 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Customized AMC/CMC for Pre-owned Products - CEMS; FORBES MARSHELL; Comprehensive Maintenance Contract (CMC); Not Applicable; Yes
SPIMX16m-2 Card of STM-1, Make Fibcom