Loading…
Loading…
4,730 results • Latest
Conveyor Belt Nylon, Width - 1400mm T. Strength/Breaking Load- 1400 KN/M. Number of Ply- 4 Nos., T
BEML make spares of Dozer
Custom Bid for Services - ---- Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - ---- Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
VALVE DISC ASSY 1968B-49CA-DB TOA, ERV Pilot Valve Assembly, Boiler Drum Safety Valve Disc
Flash Butt Welded Endless Chain, Padlock Type chain connector
BHEL MAKE FAN SPARES
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment; AS PER PQC
Operation and Maintenance Power House/Power Plant - Reblading of ID Fan Impeller BTPS Obra
Facility Management Services - LumpSum Based - Commercial; AS PER ENQUIRY; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; SUPPLY AS PER ENQUIRY; Consumables to be provided by service provider (inclusive in contract cost)
Complete Gear Box of APH Speed Reducer Type-III (5APC Equivalent), Ratio: 110: 1, Input Speed: 1430 RPM
HBL make Ni-Cd Cell, Model: KBH695P, 695AH/1.2V for 6X150 kVA UPS system
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Operation of 01 No. Weigh bridge 100T, Operation of 01 No. Weigh bridge 60T, Annual maintenance of weigh bridge 100 T, Annual maintenance of weigh bridge 60 T, Stamping of 02 Nos. Weigh bridge 100T and 60T
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Operation and Maintenance Power House/Power Plant - 426435
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Erection of new and shifting of 33 KV/11 KV/LT Lines and 25/63/100/250 KVA Sub-Station works under Fuder Full Deposit Sche..
Spares of pumps make flowmore
Vacuum Interrupter (Q3)
External top mounted Displacer type level Transmitter. HART Protocol; Level Application, Electronic
MIL Spares
Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local 24*7
Terminal Strip Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 kv substation; Substation; Service Provider
Facility Management Services - LumpSum Based - Departmental Colony; O&M of Electrical Work; Consumables to be provided by service provider (inclusive in contract cost)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 KV SUBSTATION GRATER NOIDA; Substation; Service Provider
Procurement od side arm charger for wagon tripler
Procurement of 1.5 Sqmm and 2.5 Sqmm copper wiire
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 KV SUBSTATION GREATER NOIDA; Substation; Service Provider
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Galva Coating Spray (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation, Switchyard; Service Provider
DAILY LOG SHEET REGISTER PRINTED ON LEFGER PAPER CONTAINING 32 SET IN EACH REGISTER
SUPPLY OF COPPER BOND AT 132KV S/S GHATAM[ PUR KANPUR UNDER ETD-II KANPUR.
Operation And Maintenance Of Switchyard - WORK AS PER THE ENQUIRY
SUPPLY OF TRIPPING/CLOSING COIL AT 132KV SUBSTATION GHATAMPUR, KANPUR
Ph Sensor With Fth Make-Hach Cat No Pc1r1a-33t, Double Channel PH Analyzer Existing Model- 9135-A-0004 Make- Hach included: A) Double Channel Contro, Double Channel Conductivity Analyzer Existing Model- 9125-A-0004 Make- Hach Included: a) Double chann, Double Channel with Two Probe Luminescent Dissolved Oxygen Analyzer Including Orbhishere Controller
Aluminium Sulphate, Non - Ferric (V2) Conforming to IS 260 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - General pest treatment for controlling insect yellow Bee Spider mosquitos; destroying the yellow Bee hive at various parts of 400kv and 132kv GIS hall control room and a..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Providing one number reliable hydra crane; having sufficient trunk size with the skilled crane operator on hourly basis; Service Provider
Operation And Maintenance Of Switchyard - AS PER THE ENQUIRY
APH Hot End Basket
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Residential; 4512661; Service Provider
CRC in 500 ML self spray bottle, 2.5 sq mm E Class insulation flexible wire, Silicon Selent, PU Foam, Differential pressure switch, Rubber Packing, Petroleum Jelly, Grease, Zinc Spray, WD 40 Spray, Zone card, Control Card, Ruber gasket 5 mm thick, Ruber gasket 3 mm thick
Nilkamal High-back Revolving Chair of Adjustable height with Wheels
SB Collection Silver Grey Colored Steel Shelving Cabinets