Loading…
Loading…
458 results • Recent activity
Conducting Side scan sonar surveys (Quality control for underwater works of geobags) for the four sub projects in selected reaches of the river Brahmaputra
Conducting Baseline Socio-Economic and Census Survey Related to Social Impact Assessment under Additional Financing (Phase 2) of CRBIFRERMP
Supply, Installation and Commissioning of Active LED Display System at Brahmaputra Auditorium Hall, Assam Water Centre, including Buyback of Existing 25 Numbers of 55 inch LED-backlit LFD LCD Panels
CE/EAP/ARRBP/OCB/Bridge-1/Cachar/15 Construction of Bridge in Cachar district i) Br.No.2/1 On Binodnagar Baluchari To Taranathpur Road
Supply, installation and testing of IT Hardware and Peripherals for AADB Office at FREMAA
Conducting River Surveys (Bathymetry, Flow, Sediment measurement) Lot 3 Goalpara