Loading
Loading…
Loading…
759 results • Recent activity
THIMMAL ANGANWADI ROAD CONCRETING PHASE 2
NAALUMUKK NELLIPPARA MANIYAMBRAPADY DWSS
Construction of road to Kiliyara Venappara flat
IDINJAMALA MANIKKADA DWSS
Annual Plan TAKE A BREAK COMPLETION WORKS 2025 26project no 054 26
The proposed road is in ward 06 in Kanchiyar GP. Total length of road from Johny Kada Palam to end of road is 1.300 km. In this estimate proposed Re tarring only 350.0 mete length and width 3.0 meter.