Loading…
Loading…
2,575 results • Latest
Restoration of walking track in Sivaji park in ward no:17 of EAST Zone.
Engaging of Hire tractors for Main Road Garbage Collection and for Lifting of construction debris for the month of May and June 2026 in Dharmavaram Municipality under General Funds 2026-27
Drilling of 2Nos of power bores with tanker filling facilities at Nerellavalasa ward No.4, Bheemunipatnam Zone of GVMC.
Widening the BT road, Construction of VCC drains, center divider and RCC cross culvert from UPHC center (Laxmi Nagar) to Ramakrishna Nagar (Down road) in Ward.No.90 of Zone-VIII of GVMC. (2nd Call)
Widening of BT road, Construction of VCC drains, RCC cross culverts, and RR Revetment from Bore.No.92/52 to E.P.No.186A/2 in Ward.No.92 of Zone-8. (2nd Call)
Widening the BT road, construction of VCC drains, and RR Revetment from D.No.14-124 to UPHC centre (Laxmi Nagar) in Ward.No.91 of Zone-VIII of GVMC. (2nd Call)
Widening the BT road, Construction of VCC drains, center divider and RCC cross culvert from Ramakrishna Nagar (Down road) to Vamsi Super Market (Susarla Colony junction) in Ward.No.90 of Zone-VIII of GVMC (2nd Call)
Widening of BT road, Construction of VCC drains, RCC cross culverts, and RR Revetment from E.P.No.186A/2 to Door.No.14-124 in Ward.No.92 of Zone-8. (2nd Call)
Construction of SW drain from D.No.2-108/7/20 to E.P.No.27A/2 at Gokuladam Colony in Ward.No.94.
Engaging of Security guards (unskilled) for maintenance of Zonal office in Pendurthi Zone for a period of 1 year i.e, from 01.04.2026 to 31.03.2027
Construction of toilets to the Anganwadi building at Appannapalem in Ward.No.94.
Construction of SW drain from pipe culvert to Laxmipuram in Ward.No.95 of Pendurthi Zone of GVMC
Laying CC road from D.No.3-12 to E.P.No.5C/4 at Gavarapalem, Lakshmipuram in Ward.No.95 of Pendurthi Zone, GVMC
Providing precast cover slabs on SW drain from Ayyappa Swamy temple to Sabbavaram bridge in Ward.No.96 of Pendurthi Zone of GVMC
Rerouting of existing of 250mm dia RCL bulk water supply pipe line (Raiwada source) in 450mm dia MS casing pipe at Railway crossing Portion through Horizontal Direction Drilling Method near railway Bridge no.1655 at NAD fly over of GVMC under Deposit Contribution Work
Rerouting of existing of 250mm dia RCL bulk water supply pipe line (Raiwada source) in 450mm dia MS casing pipe at Railway crossing Portion through Horizontal Direction Drilling Method near railway Marshalling Yard-I at NAD fly over of GVMC under Deposit Contribution Work
AMC Work estimate for overhauling and running maintenance of XRP- 883 bowl mills of Unit-3 and Unit-4 of Stage-II, Dr. M.V.R. RTPP from the date of awarding work to 30.09.2026
Temporary Restoration to Appayakandriga Tank bund, Field Channels, Feeder Channels and Surplus Course Channels in Appayakandriga Village Limits in Nellore Rural Mandal of SPSR Nellore District.
AMC for replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, Take up pulley bearings replacement and overhauling of main reducer gearbox, R.C Feeders and Patch welding of 22" coal pipes from all corners of boiler to classifier outlet gate and dismantling of damaged feeder outlet upper and lower chutes and replacement of new/reconditioned chutes, Replacement of center feed pipe of 36" Gravimet feeder Out let, Repairing of 22" coal pipes from classifier outlet gates to all corners of boiler and rectification of Coal Leaks in Critical areas of in service 22" Coal pipes (48 No's) from mill outlet bends to fuel inlet bends,Clearing of coal jam at Bunker chute or Bunker raw coal gate of Unit-3 and 4, Stage-II, Dr M.V.R. RTPP as and when required from the date of awarding work to 30.09.2026
Laying of VRCC Drain & Culverts from EP No. 787/C/A to PNR Residency at Kommadhi double road in Ward No. 06 of Zone-II.
Providing cut stone flooring inside the Prakaram to Sri Bugga Ramalingeswara Swamy Temple at Kalavabugga(V), Orwakal(M), Kurnool Dist.
Improvements to the Existing footpath with suitable climbing slope and with shelter to SV Temlple, Upamaka V Nakkapalli M Anakapalli District
Somasila project - South feeder channel- FDR 10/2025- Restoration and Rectification of Aqueduct at km 52.385 and Removal of the deposited earth due to gullies from km 49.950 to km 52.400 of SFC
Reconstruction of Culvert on K Konduru Branch Canal at Katam Raj Konduru V in Duggirala M of Guntur Dist
Providing FHTCs under retrofitting in Mattaparthivaripalem H/0 Valluru GP of Achanta Mandal in West Godavari District Est. Cost Rs. 5.38/ 2.93 Lakhs (Part-B Only)
Providing CC Road in the Agrl. Market Yard, Narasannapeta of AMC, Narasannapeta in Srikakulam District
Construction of Damaged Portion of Compound Wall in the Agrl. Market Yard, Narasannapeta of AMC, NArasannapeta in Srikakulam District
Layiong of 110MM Dua UPVC Pipeline from 1/433-3 Opposite to RTC Hospital Culvert at Road No. 06, Maruthi Nasgar in 20th Division of Kadapa Municipal Corporation
Replacement of damaged AHU IDU coils with new coils at Sri Venkateswara Divyakshethram in Visakhapatnam
Maintenance and Repairs to Inside Shop cum Godowns 9 - 16 at Dr NTR Market Yard Anakapalli of AMC Anakapalli in Anakapalli District
FDR-10/2025- Temporary Restoration to Protection Wall Koduru Channel Left Side near Agraharam drop in T.P.Gudur Of SPSR Nellore Dist
Restoration of 42R Major by removing of deposited earth by doing earth work Excavation from KM 0.000 to Km 1.300 near Boyilachiruvella village of Atmakur Mandal in SPSR Nellore Dist
Reconstruction of sluice of Yanamadurru drain Right bank @ Km.11.200 in B.Kondepadu (V), Pentapadu (M), West Godavari District.
Providing grating and Removal of Slit from Choked Ducts in BRTS Road from Kancharapalem Mettu to Urvashi junction in ward no 56
Hiring of Private Vehicle for the purpose of inspection of the works in Deputy Superintending Engineer (R&B) Circle Chittoor for the period 2025-26 (from 01.04.2026 to 31.03.2027)
Providing Scour points at Various locations in 44th, 46th & 48th Divisions under AE-4 section, Circle-I area. (2nd call) Rc.E6-106039/2026
Reconstruction of sluice of Yanamadurru drain Right bank @ Km 6.100 in Konala village limits, Tanuku (M), West Godavari District
Renovation of Kitchen Shed, Dining Hall & Seating arrangements to Govt. Social Welfare Boys Hostel at B. Nidamanuru (V) N.G. Padu (M) in Prakasam District.
Laying of Internal CC Roads in Maddekhan Mosque Graveyard, in Division No.38.
Construction of cause way on Gadidala vagu on Gurazala -Daida Road ,of Gurazala (m)
Engaging of 2 No of 4000 liters capacity water tankers for a period of 4 months to water scarcity areas as a part of Summer Action plan-2026 in 38,39 & 40th division, circle-I. (10TH call)
Temporary Restoration for damages to golakandukur fields road near konda in Golakandukur village in Nellore Rural Mandal of SPSR Nellore District.
Laying of damaged CC road from Railway track to D.no 35-40-1 at Dayananda Nagar in ward no 56
Laying of CC Road, Drain & Culvert from Annamraju Layout to AU Teachers layout in Ward No. 06 of Zone-II.
Improvements to the road from Km.0/0 to 2/4 of Vemulapalli Ayacut road in Anantapuramu District (2nd Call)
Providing of Split A.C Units to UPS Control rooms at new SVBC Building, Tirupati.
Urgent electrical Repairs to Residential Quarters of the Civil Judge (Junior Division) complex at PODILI in Prakasam District.
Urgent electrical Repairs to Residential Quarters of the Civil Judge (Junior Division) complex at PODILI in Prakasam District.
Providing MS framed structure for placing the PVC pots for the vertical garden purpose at Sagar Nagar gedda both sides and Rushikonda left side along the beach road in Madurawada Zone.
Construction of VRCC Box culvert at E.P No.209B/3/1 near Sri Nilayam Apartment in Ward No.87, Gajuwaka Zone of GVMC