Loading…
Loading…
352 results • Latest
Replacement of check nuts and spindle rods of various dia and maintenance of repair in ward no 17 and 43 (SAP ) General Funds 2025-26
Hiring of 02 Nos tanker for transportation of portable water in W.Nos: 03,14,15,16 of GWMC for Period 4 Months (General Funds 2025-26)
Supply of Bore Well Hand Pump Materials in Ward.No.03,14,15,16,17 and 43 in GWMC. (Reserved for SC Societeis/SC Individual) General Funds 2025-26
Supply and delivery of leakage materials in Ward.No.3,14,15,16,17 and 43 in GWMC (General Funds 2025-26)
Establishing the Chalivendram (Drinking Water Shelter) in W.No.3,14 15,16,17 and 43 in GWMC (General Funds 2025-26)
Arresting of leakages in Div.No3,14,15,16,17 and 43 (General Funds 2025-26)
Making inter connections from Existing Openwells, Power Bores to Existing Pipe Lines in W.No.03,14,15 and 16, 17 and 43 GWMC (Reserved for SC Societies/SC Individual) General Funds 2025-26
Laying of 110 mm dia and 160 mm dia HDPE pipe line and Inter Connections and Sluice Valves in Div.No.17 and 43 (Reserved for ST Societeis/ST Individual) General Funds 2025-26
Replacement of check nuts and spindle rods of various dia and maintenance of repair in ward no 24,25,26 and 27 (SAP) General Funds 2025-26
Providing Chalivendrams in various places in Division No.18,19,20 in GWMC For Period 2 Months (General funds 2025-26)
Laying of 110 mm dia and 160 mm dia HDPE pipe line and Inter Connections and Sluice Valves in Div.No.3,14,15,16 (General Funds 2025-26)
Flushing of Existing Non working borewells at various locations in Ward No12,13,22,23 GWMC.
Providing Chalivendrams in various places in Division No.12,13,18,19,20,21,22,23,26 and 27 in GWMC For Period 2 Months (General Funds 2025-26)
Engaging of unskilled labour for Arresting of leakages and Hand Pumps Repairs in W.No.03,14,15,16,17 and 43 of GWMC (General Funds 2025-26)
ESTABLISHING THE CHALIVENDRAM (DRINKING WATER SHELTER) FOR SUMMER SEASON - 2025-26 IN WARD NO.29, 32,33,40,41 AND 42 (SUMMER ACTION PLAN - 2025-26) GENERAL FUNDS 2025-26
Establishing chalivendram in 34,35,36,37,38,39 division (General Funds 2025-26)
Engaging of un skilled labour for Water supply maintenance and Supply and of Leakage Material in W.No. 12,13,22,23 For 2 months (General Funds 2025-26)
Engaging of 1 water tanker in Div.Nos. 18,19 and 20 (General Funds 2025-26)
Flushing of Existing Non working borewells at various locations in Ward No03,14,15,16,17 and 43 of GWMC (General Funds 2025-26)
Engaging of labour for water supply and borewell maintenance in Div.Nos. 24,25,26 and 27 (General Funds 2025-26)
Engaging of 2 no of water tankers in 34,35,36,37,38,39 division (General Funds 2025-26)
Hiring of 1 Nos tanker for transportation of portable water in W.No: 17 of GWMC for Period 4 Months (General funds 2025-26)
Hiring of 1 Nos tanker for transportation of portable water in W.Nos: 12,13,22,23 of GWMC for Period 2 Months (General Funds 2025-26)
Hiring of 1 Nos tanker for transportation of portable water in W.Nos. 43 of GWMC for Period 4 Months (General Funds 2025-26)
Engaging of 1 water tanker in Div.Nos. 24,25,26 and 27 (General Funds 2025-26)
Attending leakages in 34,35,36,37,38, 39 division (General Funds 2025-26)
Providing temporary lighting arrangements on Hire basis for Celebration of Sri Rama Navami Festival 27.03.2026 at Hanuman Temple in Div No22.
Raising of 80,000 saplings in 6" x 8" and 4" x 7" bag size in Christian Colony nursery site-1
Raising of 40,000 saplings in 6" x 8" and 4" x 7" bag size in Laxmi Mega township nursery site
RAISING OF 80,000 SAPLINGS IN 6" X 8" AND 4" X 7" BAG SIZE in Suryakutir nursery site -1
Raising of 80,000 saplings in 6" x 8" and 4" x 7" bag size in suryakutir nursery site-2
Laying of CC Road and CC Drains from 60ft. Road to Hno 1-9-1286/A/4 at Sree Rama Colony in Div No 50
Providing Flooring, Sealing, Wiring, Electrification Works for the Community Halls of Neetaji Gadwala and Besta Sangam in Division no 29
1) Widening of CC Road from H.No.2-9-936/1 to H.No.2-9-911 and Opp.H.No.2-9-902/4 to H.No.2-9-931 at Indira Nagar S.C Colony, Waddepally, 2) Laying of CC Road from H.No.2-9-1212 to Jagan Mohan Ayyagaru House at S.C Colony, Waddepally and 3) Construction of CC Drain from Existing CC Road to H.No.2-9-490 at Srilaxmi Nagar Colony, Hanamkonda in Div.No.58
1) Wideing of CC Road from H.No.2-8-127 to Ep.No.WCC / 20 at Mudirajwada, 2) Laying of CC Road from Ep.No.WCC / 20 to Ep.No. WVH / 14 (Chinna Shivalayam) and 3) Construction of Rcc Slab Culverts and Widening of CC Road at Opp.H.No.2-10-168/3 and H.No.2-10-168 and Ep.No.W V H I / 8 to H.No.2-10-166 at Kapuwada, Hanamkonda in Div.No.60
Laying of C.C road and C.C Drain From H.NO 30-2-731 TO 30-2-720/A , 30-2-722 TO 30-2-724, Thoutireddy Mahipal reddy house to Gousiyabee house, Pittala srinu house to Gurrala Babu house at Tekulagudem , Madikonda and unikicherla in Division no 64
Laying of CC Road and Construction of CC drain at Subbaiahpally Nirupanagar thanda, Boda thanda , Kapura thanda, Devannapet, Yellapur and Munipally in Division no.65
Laying of C.C Road and Construction of C.C Drain Jogu Ramesh house to Existing B.T Road, CH.Anil house to Anganwadi centre, Existing B.T Road to Arshanapally Devender rao house, Banda sravanthi to kanakam pelina at Station pendyal , Rampur in Division no 46
Laying of CC Road at H.No.23-6-185 and Formation of WBM road at Vedavathi nilayam Rushi nagar, hunter road in Division No.31
Construction of Mudhiraju Community hall at Kadipikonda in division no 45
1) Construction of CC Drain, Rcc Slab Culvert and Widening of CC Roads from H.No.1-1-228/B to H.No.1-1-226 and H.No.1-1-192/9-1-A to H.No.1-1-216/A1 and H.No.1-1-215/1/2 to H.No.1-1-192/B at Prashanth Nagar, Hanamkonda in Div.No.61
Laying of C.C Road and Construction of C.C Drain from Jakkula Sudharshan house to masjid, Bodria To Gandhi statue , Masjid to Dopathi Yadavareddy , Dasari devender reddy to Dopathi surender reddy , Katta Sammaiah house to Nanneboina Ravi house , Vangala Ashok reddy to Akarapu Ranjith house and internal lanes singaram and jogaiahpally in Division no 44.
Laying of CC Road and Construction of CC drain at Devaraj colony, Fci Colony , Vadhiraju colony Sadashiva colony and Vivek gopalaram in Division no.56
Laying of CC Road and Construction of CC drain at Maruthi colony road no.1, 2, 3, 4, 5 Jawahar nagar road in Division no.56
Laying of CC Road and Construction of CC Drian Venkateshwara colony Mula Sammaiah house back side Laying of CC Road and Construction of CC Drain, Kheshavapur road to Thala kokkula subash house and Laying of CC Road and Construction of CC drain from Union Bank back side to Sidhakumar house in Division no.66
Laying of cc roads and cc drains from 25-6-149/1 (Market Arch) and Hno 25-6-142 at Vegetable Market Road Vishnupuri Internal Lanes And Hno 25-7-264 to End of the Lane and and Mahankalitemple Road from Hno 25-7-184/2 TO 25-7-90 Yadavanagar and Existing CC Road St Anns School Road to Muslim Gravyard In Div No 63
Laying of CC Road and Construction of CC drain at Komatipally village and Bheemaram village in Division no.55
Laying of CC Road and Construction of CC Drain in Internal Lanes at Pragathi Nagar (Slum) in Div No 49
1) Widening of CC Road from H.No.2-6-1376 to Ep.No.BNG55/L 14 at Bhavani Nagar, Road No.1-C, 2) Widening of CC Road from H.No.2-6-1168/4 to H.No.2-6-1173 at Srinivasa Colony, 3) Widening of CC Road from H.No.2-7-305 to Rajiv Park Main Entrace at Excise Colony, 4) Construction of CC Drain and Rcc Slab Culvert at Excise Colony Road No.7 B Junction and 5) Widening of CC Road from Ngos Colony 60ft B.T Road to End of the Road at Nehuru Nagar, Hanamkonda in Div.No.59
Fixing of M.S Grills and Construction of C.R.S Masonry at damaged portions on hunter road main road in ward no.31 (3rd Call)