Loading…
Loading…
19 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of High Vacuum Oil filtration of various rating transformers on as and when required basis at Switchyard at GTPS; As per ATC-199
SUPPLY OF TUBES AND WORK OF INSITU RETUBING AS PER
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of Overhauling of Unit No 3 4 fly ash coarse ash dry ash unloading System of ESP ECO APH and Stack Hopper Jet Pump during AOH COH as and ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; work of Housekeeping and spillage cleaning at Crusher house stage I and II and other various location of CHP Gandhinagar TPS on as and when required..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of Servicing Overhauling and Repairing of ID Fan FD Fan PA Fan SA Fan Rotary Auxillary Gate Dampers and Its connecting system of Unit 3 4 a..
Operation and Maintenance Power House/Power Plant - Hiring of 02 (two) Crawler mounted excavator machine for manual unloading of coal rakes near wagon tippler 1 and 2 manual hopper area and to handle various emergency work of CHP Gandhinagar TPS