Loading…
Loading…
125 results • Recent activity
Technical Grade Sulfur Hexafluoride (SF 6) for use in Electrical Equipment as per IS 13072 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6475931 Dated : 02-08-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 343616 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CHIEF ENGINEER Gandhinagar Thermal Power Station, Gujarat State Electricity Corporation Limited (GSECL), Gandhinagar, Gujarat-382041 (Chief Engineer) Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Xlpe Cables, Category C2 - FR - LSH, for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) (Q3), XLPE Cables for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid Number : GEM/2025/B/6927348 Dated : 02-12-2025 Bid Document 1/13 Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Xlpe Cables, Category C2 - FR - LSH, for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Advisory Bank Bank of India Schedule 1 EMD Amount (In INR) 196116 Schedule 2 EMD Amount (In INR) 115122 Schedule 3 EMD Amount (In INR) 35048 Schedule 4 EMD Amount (In INR) 1641 Schedule 5 EMD Amount (In INR) 769 Schedule 6 EMD Amount (In INR) 236879 ePBG Detail 2/13 Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CE (GEN) Gsecl Corpotate Office, Energy and Petro Chemicals Department Gujarat, Gujarat State Electricity Corporation Limited (GSECL) Vadodara, (Company)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Removal/Replacement/Erection of Metallic Expansion bellows of APH; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Surendranagar Pumping Station; Maintenance Contract for software and hardware maintenance of Mitsubishi make Q Series PLC system; As per ATC
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7042754 Dated : 25-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 36 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Additional Chief Engineer 2/7 Gujarat State Electricity Corporation Limited (GSECL), Utran Gas Based Power Station, Utran (Additional Chief Engineer) UIN Number NCTGC2415P
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero Camper; As Per Tender Terms; As Per Tender Terms; A/C; 12, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero Camper; As Per Tender Terms; As Per Tender Terms; A/C; 24, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero Neo Plus; As Per Tender Terms; As Per Tender Terms; A/C; 24, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero Neo; As Per Tender Terms; As Per Tender Terms; A/C; 24, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero Neo; As Per Tender Terms; As Per Tender Terms; A/C; 12