Loading…
Loading…
926 results • Latest
Providing CC Drains and Culverts at Midhilapuri Colony beside Golden Gate Apartments in Ward No. 08 of Madhurawada Zone.
SUPPLY OF TDBFP DRIVE TURBINE OIL SEAL RINGS AND GASKET FOR UNIT-1 AND UNIT-2 PERTAINING TO TM DIVISION
Construction of CC Drain from Ballamarket junction D.No.12-1-1 to D.No.12-5-1/1 in Chinna veedhi, 17th and 18th Wards under KAUDA (LRS & BPS Grant)
Providing Plantation in Central Median of Siddavatam Main Road , Badvel Municipality.
Maintenance of State Highways in (R&B) Section, Kothapeta for the year 2026-27
Annual Maintenance of MDRs in (R&B) Section, Sattenapalli for the year 2026-27 in Palnadu District
APSPCL - Carrying out Operation and Maintenance of 2 Nos. 220/33kV Pooling Sub Stations-1 and 4 and associated 220kV DC lines including 33 kV lines, Water Supply System at N.PKunta site of Ananthapuramu-I Ultra Mega Solar Park (1500 MW), Sri Satya Sai District, Andhra Pradesh for a period of two years.
Laying of CC Road from Rama Sai Mandir to Veera Raghavulu house D.No.12-3-20/5) in Ward No.14 (under 15th FC Grant)
Disiltation of Major Drains at Ward No. 7 to 12 in Yemmiganur Municipality.
supply of Electrical materials to lovathota shed up hill
Laying of CC Drain, VRCC Culvert and CC Road from Shreya Residency to MIG-387 at APHB Colony PM Palem in Ward No. 06 of Madhurawada Zone.
Engaging 2Nos of Truck mounted Suction Machine (GULFER) on hire basis for Monsoon Action Plan-2026 in AE-13 Section Works Division-II Area
APSPCL - Carrying out Operation and Maintenance of 3 No. 220/33 kV Pooling Sub Stations-1,2 and 3 and associated 220 kV DC lines along with 33 kV lines and water supply system at Galiveedu site of Ananthapuramu Ultra Mega Solar Park (1500 MW), Annamayya District, Andhra Pradesh for a period two years
MAINTENANCE OF STATE HIGHWAY ROADS IN (R&B) SECTION, CHITTAMUR FOR THE YER 2026-27
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management of Seela Medium Drain from Km 5.800 to Km 10.800 in Kakinada District in Ramachandrapuram Sub-division in G.E Delta for the year 2024-25
Providing CC road , CC drain at SVN Colony 7/1 line and CC drain at 7th line (EAST SIDE) in Div.No.42 under AE-01 Section, Guntur Municipal Corporation.
Development of Walking Track ,gym equipment & Compound Wall At Siddhartha Nagar 1/2 line in Div.No 42 Under GMC.
Supply of Vegetables to Hostels of Yogi Vemana University, Kadapa
Extension of pipelines in Mutyalampadu village of Dachepalli Mandal Est. Cost Rs. 7.50 Lakhs under 15th FC TIED Grant (DW)
Providing CC Roads to Connecting bits of 1 & 2 Roads (Opp. Vambay Colony ELSR) at Devineni Gandhi Puram Area in 61st Division
Improvements and Special Repairs to Sri Venkateswara Swamy Temple, Siddantham(V), Penugonda (M), West Godavari District
Supply, repair and replacement of cabin body, hydraulic system, engine components, chassis parts and various mechanical components for vehicle no AP05TG3910 in kakinada municipal corporation.
Temporary Arrangements of Basic Needs items for Several Programs in 5,6,7&12 wards under AE-9 Section LLR
Providing Seating system in The existing Free SS Q line and Rs 50 lines from 1st gopuram to 3rd gopuram
Providing Under ground Drainage Pipe Line from St. Joseph Hospital to Near Police Club in the process of road widening (Reach-2) in Div no 23 under AE-5 Section
Providing Under ground Drainage Pipe Line from St. Joseph Hospital to Near Police Club in the process of road widening (Reach-2) in Div no 23 under AE-5 Section
Providing 110mm dia HDPE Pipe Line and Wet Mix Road at Lakshmi Nagar 4th line Existing CC Road end to Sai Baba temple near Lalpuram VIP road in Div.no.25 under AE-5 Section.
Summer Action Plan -2025-26 ,Supply and Delivery of Hand pump Bore spare parts Sets for Maintenance of Hand Bores at Various locations in Div.No.50,51 under A.E-10 Section
Monsoon Action Plan-2026] Removal of Wet Silt in Outfall Drain at Amaravathi Road from Vishal Mart to Inner Ring Road( Electrical Sub Station) (along East Side) and Seethaiah Donka from JKC College Main Road to Neelampati Sri Lakshami Ammavari Temple in Div. No. 46.
Supply of 33KV Curren Transformers with porcelain housing with 31mm/kV
Construction of Balance RCC Culvert at A.T Agraharam main road Chuttugunta junction under AE-5 Section.
Providing Hot Mix BT Road at Collectorate Road from Three Statue Center to Municipal Travelers Bunglow in Div No.23.(15th FC) -2nd call
Providing BT Road Main road to Swathi Castle houses under Secretariat 169 in Div No:27 Under AE-7 Section.
Hire charges for providing temporary electrical illuminations during all the fairs & Festivals in SV temple at Rajam (Anthakapalli) for the year 2026-27
Construction of Anganwadi Centre at Chempaputtu Village in Bondapalli GP of Pedabaylu Mandal of ASR District Estimate Rs.12.00 Lakhs
Providing Thermoplastic Road Marking Paint and Studs for J.K.C. College Road from Shresta Hospital to Maha Lakshmi Bar in Div.No. 42 of GMC.
Providing scour outlet point,raising of valve pits and minor repairs at Vikas nagar ELSR in Div.No.42 under AE-01 Section,Guntur Municipal Corporation.
Formation of windrows with fresh waste & Lifting , loading of Dry/Mixed waste to the JSW vehilces and in waste processing plant of Nandyal Municipality
Carrying out miscellaneous shrouding of units-3&4 boilers during annual overhaul period for the year 2026-27.
2026-Eng01-GN-107 Providing Central Median Grills from Thotlakonda to S.N.R. Guest House at K. Nagarapalem in ward no.04 of Bheemunipatnam zone
Improvements and Special Repairs to Sri Ramalingeswara Swamy Temple, Udimudi(V) P Gannavaram(M), Dr.B.R.Ambedkar Konaseema District
Construction of Drains,Culverts and CC road at Cobaldpet 8/1,8/2 cross roads and Ashok nagar 4/6/1 cross Road under Division number 34 ward in Secretariat number 121 in AE2 section of GMC. (3rd call)
SUPPLY OF USHA MARTIN MAKE STEEL WIRE ROPE SIZE- 20MM DIA & 18 MM DIA
Restoration of CC potoholes/ CC Road repair works in 22,23 Wards of Srikalahasti Municipality(5th Call)
Engaging truck mounted sewer suction machine (GULFER) on hire basis for a period of 153 Days (for MRT Points) in AE-3 Section, Works Division-II Area
Laying of CC Road from Yerroju Nambachari house (Pole No.SS 99A8) to Ponnuru Rammohan House (D.No.20-194) in Ward No.07.