Loading…
Loading…
18,288 results • Recent activity
Construction of Street With M-40 ISI Paver Block alongwith 200 mm PVC 200 mm dia pipe both side from H/o mohit gupta to H/o vivek kaushal and laying of PVC pipe both side from H/o vivek kaushal upto college college opposite VSK international school,
CONSTRUCTION OF IPB RASTA FROM H/o Imran S/o Ramjan To Balbir S/o Junddu khet VILLAGE KHORI KHURD BLOCK TAURU DISTT NUH MMKKSY
Const of Sub Health Center at vill Bhunsla
Construction of IPB Rasta from Tara S/o Naval khet to Atta Mohd. Khet Tak Gp Khori Khurd Block Tauru Distt Nuh MMKKSY
Rough Cost Estimate for Renovation and Revamping of 6.0 MLD SBR based STP at Narnaul (Formerly Under MC Narnaul)
Estimate for SITC of VRV Air conditioning in classroom of 2nd and 3rd Floor (prefab room) of Computer Science and Engineering Department in the J.C. Bose University of Science and Technology YMCA Faridabad.