Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
430 results • Latest
Construction of Cement Concrete road at the entry point from Rewari- Bawal
hp Electrophotography/Xerography (Laser/LED) Colour A4 and Legal Size Multifunction Printer (MFP)
Supply, Installation, Testing and commissioning (SITC) of electrical fixtures including chemical earthing for new L.S. connection of 250 KW at Storm water disposal plant, 10MLD CETP, IMT Rohtak.
Hiring of JCB, tractor with trolley and labour for cleaning/removal of wild growth, malba/solid waste debris and other kind of waste and demolition/removal of encroachment from the HSIIDC land/area at Udyog Vihar, Phase-VI and VII, Gurugram.
Operation and Maintenance of Pump Sets , Sewerage Disposal Plant and Storm Water Disposal Plant at Sector-34 and 35, Udyog Vihar, Phase-VII, Gurugram
De-silting/cleaning of sewer lines and storm water drainage lines at various location in Phase-VI, Udyog Vihar, Guurugram.
Repair of roads (Patch work) at various locations in Sector-9, Phase-III at IMT Bawal
Providing and laying of DBM and BC in Sector- 8, Phase-III at IMT Bawal.
Repair of road cracks/ patches at various locations in Phase-V sector-53 and
Plantation of plants along the drain no. 8 and Phase-IV sector-57 and Phase-V
de-silting/ cleaning of sewer/ storm water lines by super sucker machine in
Work of construction of two bays fire station buildijng at Industrial Estate, Phase-II, Panchkula Extention-II (formerly known as Industrial Estate, Barwala Distt. Panchkula)
Sweeping of roads including berms (ROW) disposal of waste complete in all respect.
Door to Door collection of garbage in Block A and Food Park in Ph-I at I.E, Rai.
Providing JCB and tractor trolley for shifting of malba and other various work at I.E,Rai
Cleaning of sewer and storm lines with the help of labor and suction machine for attending allottees complaints in Phase -II at I.E Rai
Maintenance of Plants and watch and ward the assets during night hours by deploying mali and security Guards for one year at 3 MLD WTP and 1 No. boosting station at IE Rohtak
De-silting/ cleaning of storm water drain line including gully-gratings by super sucker machine 568 to 396, 1288 to 1272 GB and 1389 to 1406 GB in PH-1 at IE Rai
De-silting/ cleaning of sewer line by super sucker machine Near CETP to 566 Sector-38, Phase-I at Industrial Estate Rai
Electrification and street light system in R and R Area Sector 4B IE Bahadurgarh
Providing 02 no feeders emanating from 33 KV and 11 KV Substation PSS I towards Phase III IMT Rohtak
Laying of Earth Along the Wall of Out-fall Drain to Strengthen the Wall at HSIIDC, IMT Manesar.
Construction of 20 mtr. wide Road from Sector-3 to village Khoh at IMT Manesar.
Providing and fixing of interlocking paver block and making of chute drain for disposing of rain water in front of GH-31 to water works in Sector-1 at IMT Manesar.
De-silt cleaning of storm water drainage and sewer lines with jetting and suction machine including road gully chamber in Sector-3 and 3A., Indl., Estate, Karnal.
De-silt cleaning of storm water drainage and sewer lines with jetting and suction machine including road gully chamber in Sector-3, Extn., Indl., Estate, Karnal.
Planning, Design, Engineering, Procurement and Construction of Shri Krishna Ayush University for 1st Phase at Kurukshetra on EPC basis including DLP of 36 months and OandM for 12 months for all services.
Providing laying spreading and compacting graded stone aggregate to wet mix macadam on road no 7 8 9 10 at SGC Murthal
Work of cleaning the metal portion of road in phase III, I.E Barhi
Work of providing and fixing 75 HP monoblock motor and pump (Kirlosker make) at storm water disposal phase III, I.E Barhi
Construction of fresh earth bunds for storage and containment of CETP treated waste water in Ph-IV, IMT Bawal.
Maintenance of Office Lawn at HSIIDC Office Complex, Sector-17, Industrial Estate, Bahadurgarh
Providing and laying of interlocking paver block M-35 near plot 556 in Phase -I at I.E ,Rai
The work of plantation of plants from Road no. 5 to Road no. 4 in central verge of Road no. 2 at IMT Kharkhoda
The work of Fixing of Demarcation Pillars for various plots and roads at IMT Kharkhoda
The work of Hiring of 03-Nos JCB Machine for Jungle cleaning at IMT Kharkhoda
Repair of road cracks/ patches at various locations in Phase-I to V at IE Kundli
Operation and maintenance of water works in Phase-IV, Sec-57 at I.E. Kundli
De-silting/ cleaning of sewer/ storm water lines by super sucker machine at various locations in Phase-I to V at IE Kundli
De-silting of Storm Water line 300mm dia by Super Sucker Machine at various location of Udyog Vihar, Phase IV and V, Gurugram
Work of providing street light system in industrial area Sector-11 Rewari
Replacing existing PVC water supply lines by laying DI pipes in HSIIDC, Industrial Estate, Sector-59, Faridabad.
Construction of unpaved walking track inside green belt/park near Group housing site at Sector 30B, Phase-II, IMT Rohtak
Clearing jungle/uprooting of rank vegetation inside and outer boundary of green belt along Industrial Sector 30 B for plantation work by Forest Deptt., HSIIDC, Phase-II, IMT Rohtak
Procurement of 25sqmm 4core armoured cable for street light in Sector-30B (RandR), Phase-II, IMT Rohtak
Operating 5 Nos. Pump Sets for Disposal of Rain Water at IMT Kharkhoda
The work of Hiring of 02 Nos Tractor with P.T.O pump for disposal of rain water at IMT Kharkhoda
Providing and laying of 1000 mm dia RCC NP-3 pipe line from village Nizampur Khurd to Thana Kalan drain for crossing 60 mtr wide under construction Road no. -1 at IMT Kharkhoda
The work of providing, installation and commissioning of 20 BHP and 10 BHP Kirloskar make diesel engine along with accessories for disposal of storm water from roads at IMT Kharkhoda
Raising the level of foundation of two gensets and connectivity with existing road at Industrial Estate, Ambala Cantt