Loading…
Loading…
4,751 results • Latest
KTL-1 Amtc of EPHS in various sector UE Kaithal.
K-2 A/mtc of EPHS in various Sector UE Karnal
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
J-3 A/mtc of EPHS in various Sector UE Jagadhari.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
Amtc of EPHS in various sector UE Kaithal.
Patch work with 50mm DBM and 30mm thick BC for 60mtr road Sector 1 and 3, MDC, Panchkula (A/mtc of roads in Sector 1 to 6, MDC, Panchkula)
Painting, kerb paint, patch work (DBM, BC, tack coat etc) infront of C.P. office, Sector 5C, MDC, Panchkula complete in all respect (A/mtc of road services 1,2,4,5,5C and Sector 6, MDC, Panchkula)
Repair and mtc. leakage in water supply pipe lines and day to day complaints and services of manpower of different dia pipe lines of 100.50 km line in Sector 23,24,25,26,27,28 and 31 U/E Panchkula (A/mtc of PH services in sector 23 to 28, 31 32 and s
Repair and mtc leakage in Tertiary water lines of different dia of 35.0 km line in Sector 23 to 28 and 31 and 32 Panchkula Extension complete in all respect (A/mtc of PH services in Sector 1 to 6, MDC, and Sector 23 to 28, 31 and 32, Panchkula Extens
ANNUAL MAINTENANCE ESTIMATE FOR MAIN WATER WORKS TOSHAM ROAD HISAR (2026-2027)
Annual Maintenance Estimate for Strom Water Drainage Scheme in Sector 14P-II and 33P , Hisar (2026-27)
ANNUAL MAINTENANCE ESTIMATE FOR STORM WATER DRAINAGE SCHEME IN SECTOR 14P-II AND SECTOR 33P HISAR (2026-2027)
A/mtc of L/s work in park , green belt and road side plantation sector-1, tarouri for the year 2025-26.(Mtc of rough grassing, plants and providing mali-cum-chokidar for watch and ward etc. and all other work contingent thereto.)
Cleaning of road berms sarkanda, jungle in sector 28, Part-II, Panchkula complete in all respect as per and all other works contingent thereto (A/mtc of PH roads in Panchkula Extension)
Cleaning of road berms sarkanda, jungle in sector 27, Part-I, Panchkula complete in all respect as per and all other works contingent thereto (A/mtc of PH roads in Panchkula Extension)
Cleaning of road berms sarkanda, jungle in sector 24, Panchkula complete in all respect as per and all other works contingent thereto (A/mtc of PH roads in Panchkula Extension)
Supply of bleaching powder including carriage, loading, unloading, stacking for water works sector 25, Panchkula (A/mtc of PH services in sector 23 to 28, 31 and 32 and sector 1 to 6, MDC, Panchkula)
Cleaning SWD manhole complete including disposal of malba within 5 km lead complete in all respect as per satisfaction of EIC at Sector 31, Panchkula Extension (A/mtc of PH services in Sector 23 to 28, 31 and 32 and sector 1 to 6, MDC, Panchkula)
AMtc of EPHS in Sector 4 Urban Estate Kurukshetra Dev of Road Water supply Sewerage and Storm Water Drainage for residential plots replanned in GH site adjoining to Additional Pocket in Sector 4 Urban Estate Kurukshetra
Prov. 12.5Mtr. long High Mast with LED Flood lights and LED street lights in sector-6 (B/W) Jhajjar including On/OFF Operation system, maintenance and on site replacement of LED lights free of cost for 03 Years. (Excluding GST)
Construction of brick toe wall at entry point on dividing road sector-17and18,Delhi Mumbai Vadodara Expressway Faridabad.
Repair of HSVP Staff Qtr. No.2874 in HSVP Colony in Sector 15 Panchkula
ANNUAL MAINTENANCE ESTIMATE FOR MAIN WATER WORKS TOSHAM ROAD HISAR (2025-2026)
Surface Dressing in Park Industrial Area Roz-ka-Meo.
Repair of HSVP Staff Qtr. No.2864 in HSVP Colony in Sector 15 Panchkula
Repair of Damaged Boundary wall of Green belt in Sec-37 Faridabad Haryana.
Cleaning of surface dressing in Green belt Sector-37, Faridabad.
Providing and fixing of MS grill and gate at entry point on dividing road sector-17/18 at Delhi Mumbai Vadodara Expressway Faridabad.
Work of Dismantling and relaying of existing water supply line of 100mm and 150mm i/d including providing and fixing of D.I. specials in Sector-9, Bahadurgarh and all other work contingent thereto
Work of Dismantling and relaying of existing water supply line of 100mm and 150mm i/d including providing and fixing of D.I. specials in Sector- 10, Bahadurgarh and all other work contingent thereto
Annual maintenance of Staff quarter in Sector-4,Gurugram. House No.2205
Construction of 10Mtr wide road, providing water supply line and sewerage line nearby H.No.1043 H, Sector-9, Gurugram
Providing 11 KV HT line, LT line, 200 KVA Transformer, 11KV HT line, LT line and LED street light in newly carved out pockets (Ashiyana Scheme) in HSVP sector-1 Pataudi. (incl. 6 years DLP for T/F and 5 year DLP for LED S/L and including switch ON/OF
Annual Maintenance Estimate for Main Water Work in Seotor 14P, Hisar (2026-27) ii
Routine mtc. of sewerage system in Sector-13-17 Panipat
Providing safety utilities at site of Raw Water Works Sector-29-II, Panipat.
HEW 88 Repairing of Road Cut, potholes and Supply of Shelly patch in various roads in Sector-2, Palwal and all other works contingent thereto.
Providing safety utilities at site of Reserve Stock Sector-11 and 25-I Panipat
Repair of submersible pumping machinery Sector-24, Panipat
Operatio of 2 Nos. tubewells No. 5 and 8 in Sector-25-II Panipat
Cleaning of site by removing wild Growth and Surface Levelling cleaance of Grass shrubs and Surface dressing of the ground including removing vegetation in in Ashiana flats Sec-47, Gurugram
Unbranded 288 pages Minute register of Colour White