Loading…
Loading…
155 results • Recent activity
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Construction of a 4lane byp. from Thekma village(km36.300) to Gosai Bazar Byp.(km242.500) with 8.135km along with widen. from 2-4Lane from Smt. LM Jun. to PI for a length 4.70km and Streng. of NH-128A from PI-Moha Jun. 41.35km(54.185km) in UP on EPC
Construction of the Icchak Flyover (with service road in partial length) at km 24.500-26.300 and Slip Road at Hazaribagh bypass from km 33.690-34.945 (LHS) and km 33.515-34.945 (RHS) section of Barhi-Hazaribagh 0.000-40.500 of NH-33 in Jharkhand
Removal of At-grade junctions at Panchganga Chowk in the Mohol-Wakhari section and at 61 Phata Malshiras in the Khudus-Dharampuri section of NH-965 in the State of Maharashtra on EPC mode
RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode.
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.