Loading…
Loading…
156 results • Recent activity
Construction of 4 laning of Sahebganj Areraj Bettiah of NH 139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode comprising (i) Section 1 Sahebganj to Areraj (38.362 km) and (ii) Section 2 Areraj to Bettiah (40.580 km)
Construction of Bypass to Gangaikonda Cholapuram in Kallagam to Meensurutti section of NH-81 (Old NH-227) in Tamil Nadu on EPC Mode
Construction of new 6 lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH 42) to Tangi near Bandalo Toll Palza (NH 16) (Km. 70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha
Construction of new Six lane Access Controlled Capital Region Ring Road from Rameshwar (NH 16) to Bilipada from Km 0.000 to Km 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 1)
Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode
Construction of 4lane South-East Bypass for Azamgarh City connecting NH-28 at existing Ch. Km 218.800 to Purvanchal Expressway at existing Ch. Km 247.850 (total length 14.905 Km) in UP on EPC Mode