Loading…
Loading…
155 results • Recent activity
Construction of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode.
Consultancy services for Independent Engineer for Construction of 4Lane Access controlled Highway from Vakalapudi Light House to Annavaram (on NH16) section of NH-516F from Km. 0.000 to Km. 40.621 on HAM under BMP, Phase1 in Andhra Pradesh.
Construction of 4 Lane Access Controlled Highway from Vakalpudi Light House to Annavaram (on NH16) Section of NH516F from Km. 0.000 to Km. 40.621 on HAM under Bharatmala Pariyojana Phase I in the state of Andhra Pradesh
Strengthening ans Improvement of Gorakhpur Kasia UP Bihar Section of NH27
Construction of 6 lane Elevated Structure along with its approaches from Km. 142.000 to Km 144.800 Total Length 2.80 km on NH27 in the state of Gujarat
Cons. of Long-Term Remedial mea. River cut/bank erosion at identified 19 locations (i.e. ARC-16 ARC-46 RC-28 RC-29 ARC-36 ARC-37 ARC-38 ARC-39 ARC-31 ARC-32 ARC-33 ARC-34 ARC-35 RC-16 ARC-17 ARC-18 RC-26 ARC-29 ARC-30) KULLU TO MANALI NH-03 in HP