Loading…
Loading…
1,437 results • Recent activity
El.D.C.No.Centre/5622/2025 Supply and Erection of 40 Nos 7 Mtr street lamp post with LED fittings at Dr Thomas Road Phase 1 in Division 117 Zone 09 Deposit Work TNUHDB
El.D.C.No.Centre/5297/2025 Painting and Numbering of 791 Nos of 3/9.5/11 Mtr street lamp post at Kamaraj Salai both side Service road Loop road in view of Republic day 2026 in Dn 114 116 120 121 125 and 126 Zone 09
El.D.C.No.Centre/4877/2025 Replacement of 345 Mtrs of 2 X 25 sqmm alu cable and Erection of 8 Nos of 7 Mtr Street lamp post at Thiruvalluvarpuram 2nd Street in dn 109 Zone 09
El.D.C.No.Centre/4302/2025 Erection of 26 Nos of 9.5 Mtr street lamp post and 990 Mtrs of 3 1/2 X 25 sqmm alu cable at Bharathi Salai due to reconstruction of SWD in dn 116 Zone 09
El.D.C.No.Centre/3967/2025 Supply and Erection of 16 Nos of 7 Mtr street lamp post with LED fittings at Vanniyapuram Scheme Thiruvalluvar Salai Division 123 Zone 09 Deposit Work TNUHDB
El.D.C.No.Centre/3416/2025 Electrification Work at Thiruvalluvar Salai Chennai High School in dn 123 Zone 09