Loading…
Loading…
2,830 results • Recent activity
LAPTOP for GUI Operation, (Specifications as attached), INDUSTRIAL FULLY RUGGED LAPTOP WITH RUGGED CASE FOR 2026., INDUSTRIAL FULLY RUGGED LAPTOP WITH RUGGED CASE FOR 2027., INDUSTRIAL FULLY RUGGED LAPTOP WITH RUGGED CASE FOR 2028., INDUSTRIAL FULLY RUGGED LAPTOP WITH RUGGED CASE FOR 2029.
RACK APW 19"CYBERRACK 24U/600D Make: Schneider Electric President Systems Limited (HAL Drawing Ref: T119.07.0002) -Each set consisting of Specifications attached., 19" standard Rack: 24 U/600D for TJ-954 of M/s. Schneider Electric President Systems Limited (details attached), INSTRUMENT CASE S42 4U/84T/185mm, P/N:ARW942Q-QCKA81669-00 of M/s. SCHNEIDER ELECTRIC PRESIDENT SYSTEMS LTD, TEST INSTRUMENT CASE, P/N: 42- 7420-02, Qty: 1 with Pull-out handles (P/N: 29-9504-3), Qty: 2, Accessories kit (P/N: 49-1647-1), Qty: 1 and Rack mount kit (P/N: 42-9104), Qtt: 1, of M/s. PRESIDENT SYSTEMS for 2026, P/N: 42-7420-02, of M/s. PRESIDENT SYSTEMS for 2027, Accessories kit (P/N: 49- 1647-1), of M/s. PRESIDENT SYSTEMS for 2028, of M/s. PRESIDENT SYSTEMS for 2029
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
I Level MFD FTE, Installation & Commisioning
Draw-wire displacement sensor(WPS-150-MK30-P25), Draw- wire displacement sensor(WPS-50-MK30-P50)
Headset, Model: H10-76, P/N: 12510G-21 (SE-HS-250-040) of M/s. Shakti Enterprises for 2026, Model: H10- 76, P/N: 12510G-21 (SE-HS-250-040) of M/s. Shakti Enterprises for 2027, P/N: 12510G-21 (SE-HS-250-040) of M/s. Shakti Enterprises for 2028, P/N: 12510G-21 (SE-HS- 250-040) of M/s. Shakti Enterprises for 2029