Loading…
Loading…
2,536 results • Recent activity
Screw Compressor (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6979411 Dated : 10-12-2025 Bid Document 1/12 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India 2/12 (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : LUCKNOW Hal Lucknow Imm, Department of Defence Production, Hindustan Aeronautics Limited (HAL), Ministry of Defence (Hindustan Aeronautics Limited) UIN Number NCTGC2415P
SUPPLY AND SERVICING OF SPARES FOR THE TEREX GENIE
Supply and installation of Digital Frequency Demultiplexer (DFD), 3Ft BNC Cable, Supply and installation of FM Demodulator
FILTER PAPER ROLL 1000MM Wx100MTRS 15, FILTER PAPER (600MM Wx100MTRS L) 5
Custom Bid for Services - REPLACEMENT OF PUMPS STORAGE TANK VALVES PIPES WITH ACCESSORIES FOR COOLING WATER CIRCULATION SYSTEM OF LAKSHMI VACUUM STRESS RELIVING FURNACE Similar Category Repair and Overhauling Service
Hot plate/Induction heater for bearing heating during assembly