Loading…
Loading…
16 results • Latest
C/o Bharathu to Jungle Jhaleda Km.0.0 to 6.035
Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST.
C/o Bhater to Kanfara Km.0.0 to 3.825
Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST.
C/o Neri to Barnu Ghanser Tunighat road Km.1.300 to 4.750
Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST.
C/o Solag to Jurasi road Km.0.00 to 4.900
Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST.
C/O link road to village Nanawain Abadi Mohmdan from Km. 0.000 to 2.000 under PMGSY-IV (Package No. HP-12- 207 ).
Excavation in hilly area in all heights and depths and in all kind of soil by ordinary rock, hard rock, chieselling, wedging out of rock(where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the MORD technical specification clause 2014 302, 1603.1 and 1603.2 and sorting out useful materials and stacking the same in all leads and lifts on acquired width of road and transportation for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to required width of the road or to approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tool and labour if required. Any loss to the public private property during the course to execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all the cases as per the direction of engineer-in-charge including carriage of material with in all leads and lifts. All useful material such as stone, shingle, sand and slates etecetra shall be sorted out. A recovery of 580.45.cum. stone to be obtained from excavation cutting at the rate of Rs. 300.00 (Rupees Three hundred) per cubic metre shall be effected on prorata bases in each running bill for this item. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government, but exclusive GST which shall be paid separately.
C/O link road Chauli to Bhagroh from Km. 0.000 to 3.100 under PMGSY-IV (Package No. HP-12- 208 ).
Earth work in excavation in hilly area in all heights and depths and in all kind of soil by mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/ wedging out of rock ( where blasting is prohibited) and their intermediate classification of soil setting out true to the required line, grades width cutting and trimming of side slopes and level as shown on the drawing and as directed by the Engineer-in- Charge at site according to the M.O.R.D. technical specification 2014 clause 302, 1603.1,1603.2 in association with other clauses.The cost of all useful material such as stones , shingles and aggregates received from the excavation shall be recovered from the contractor All the surplus material shall be disposed off by the contractor at approved dumping locations , to be identified by him at his own level and as per EMP guidelines and approval/ instruction of the Engineer without any additional cost. Any loss to the public / private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per regulations and instructions of Engineer-in-charge including entire carriage of materials within all leads lifts and other incidentals and as per direction of Engineer-in-Charge. The rates excluding of Goods Services Tax but including Labour cess, other levies/taxes , duties /royalities, cess, Toll taxes of local bodies and authorities that the contractor will have to pay for the performanec of this contract. [Recovery of useful stone i.e. 6876.57 cum (Six Thousand Eight hundred seventy six point five seven cubicmeter) shall be made from the contractor @ Rs.300/- (Rs. three hundred only) per cubicmeter amounting to Rs. 20,62,971/- (Rs. Twenty Lac Sixty Two thousand Nine Hundred seventy one only].