Loading…
Loading…
6,276 results • Latest
Electrical Installation work and arrangement of Airconditioning for Computer Lab at Regional Institute of Printing Technology Electrical Installation Work
Electrical Installation Work for SITC of 01 (One) No. 20 Passengers fully automatic bed cum Passenger Lift at ER building at Burdwan MCH, Purba Bardhaman.
Electrical Installation Work for 02 (Two) Nos Lift at Newly Constructed (G plus 7) Building Under the Main Campus of BMCH, Purba Bardhaman.
Creation of estimating section and also some finishing work at the office area of the Superintending Engineer Kolkata Electrical Circle at 2nd floor of KIT Building P16 India Exchange Place Extension Kol 73 during the year 2026 27
Urgent replacement of existing chocked swerage line 100mm Dia by 160mm dia UPVC (B-type) pipe of outside East side at KIT Building P16 India Exchange Pl Kolkata under City Division PWDte during the year 2026 27
Repair and renovation works of two numbers three storied Type - IV Residential Buildings (IV2 and IV3) of Bankura Sammilani Medical College and Hospital under Bankura Division PWD (Civil work) (2ndCall)