Loading…
Loading…
24 results • Recent activity
construction of connecting road (24.00 km) to imb fence at bp-167 and connecting road (23.00 km) to IMB fence at BP -168 along indo-myanmar border from BP-166 to BP-168 in changlang district of arunachal pradesh state on EPC mode
PROVIDING, LAYING, BM 50 MM, BC 30 MM THICK (HMP MIX), APPLYING TACK COAT AND ROAD MARKING ALL AS PER MORTH SPECIFICATIONS BETWEEN KM 15.560 TO 29.406 ON LONGDING PONCHAU ROAD OF 103 RCC UNDER 752 BRTF/PROJECT UDAYAK IN ARUNACHAL PRADESH STATE
SUPPLY AND STACKING OF STONE BOULDERS, STONE METAL 40 MM, STONE CHIPS 20 MM, STONE CHIPS 10 MM an SAND FOR PERMANENT WORK FOR CONSTRUCTION OF ROAD JAIRAMPUR LONGVI FROM KM 0.00 TO 3.50 TO NHSL SPECIFICATION TO CONNECT COBS OF ASSAM RIFLES AS PER MORT
SUPPLY AND STACKING OF STONE CHIPS 20.00 MM, STONE CHIPS 12.50 MM AND SAND AS PER MORTH SPECIFICATIONS TO BE SUPPLIED AT CBMP KM 228.500 ON ROING HUNLI ROAD FOR CONSTRUCTION OF 80 FT MODULAR BRIDGE OVER MARON NALLAH AT KM 6.800 ON ANINI MIPI ROAD OF
SUPPLY AND STACKING OF STONE CHIPS 20.00 MM, STONE CHIPS 12.50 MM AND SAND AS PER MORTH SPECIFICATIONS TO BE SUPPLIED AT BRIDGE SITE KM 7.650 ON MIPI ANDRATHANG ROAD FOR CONSTRUCTION OF TACHO NALLAH BRIDGE AT KM 7.650 ON MIPI ANDRATHANG ROAD
PROVIDING, LAYING AND COMPACTION OF WMM 75 MM, WMM 100 MM, DBM 50 MM, BC 30 MM, EARTH WORK IN EMBANKMENT, ROAD STUD, DELINEATORS AND ROAD MARKING COMPLETE IN ALL RESPECT ALL AS SPECIFIED BETWEEN KM 8 TO 15 FOR SURFACING WORKS ON ROAD DONG-JACHEP