Loading…
Loading…
2,802 results • Latest
Improvements to Existing Pushkar Ghat in between Km 60.000 to Km 60.200 on Vasista Right Bank in Elamanchili lanka Village limits of Elamanchili Mandal in West Godavari District.
Improvements to Existing Pushkar Ghat in between Km 49.600 to Km 49.800 on Vasista Right Bank in Kanchustambam Palem Village limits of Elamanchili Mandal in West Godavari District
Improvements to Existing Pushkar Ghat in between Km 55.000 to Km 55.200 on Vasista Right Bank in Pedalanka Village limits of Elamanchili Mandal in West Godavari District
Improvements to Existing Pushkar Ghat in between Km 62.600 to Km 62.800 on Vasista Right Bank in Elamanchili Village limits of Elamanchili Mandal in West Godavari District
Improvements to Existing Pushkar Ghat in between Km 57.600 to Km 57.800 on Vasista Right Bank in Gangadapalem Village limits of Elamanchili Mandal in West Godavari District
Improvements to Existing Pushkar Ghat in between Km 78.200 to Km 78.400 of Vasista Right Bank in Peechupalem village limits of Narsapuram Mandal in West Godavari District.
Improvements to Existing Pushkar Ghat in Between K.M.75.000 to K.M.75.200 on Vasista Left Bank in Appanaramuni Lanka Village of Sakhinetipalli Mandal in Dr.B.R.Ambedkar Konaseema District
Improvements to Existing Pushkar Ghat in Between K.M.62.300 to K.M.62.500 on Vasista Left Bank in Razole Village of Razole Mandal in Dr.B.R.Ambedkar Konaseema District.
Construction of Damaged Bridge across KTS channel in Paturu to Damaramadugu road near Damaramadugu Village in Buchireddypalem Mandal of SPSR Nellore District
Detailed Survey & Investigation, Preparation and approval of Detailed Project Report (DPR) as per CWC Norms, Preparation & Submission of EIA/EMP Reports as per MoEF&CC Guidelines, and Obtaining Forest, Environmental and Other Statutory Clearances for Construction of Neradi Barrage and its Appurtenant Components at Neradi Village, Bhamini Mandal, Parvatipuram Manyam District, Andhra Pradesh
Special Repairs and Improvements to Yellarthy Cheruvu near Yellarthy (V) Holagunda(M) of Kurnool (Dist.)
Sluice Repairs - Chennampalli MI Tank near Chennampalli (V), Tuggali (M) of Kurnool District.
Repairs to Sluice and Surplus weir of Gondiyanganna tank near Edavali (V), Maddikera (M) of Kurnool District
O&M of Improvements & Strengthening of Papanayani cheruvu near Keenatampalli (V) in Yadamari (M) of Chittoor District.(Item No.5)
O&M of Improvements & Strengthening of Chitramakula cheruvu near Konapalle (V) in Yadamari (M) of Chittoor District. (Item No.8)
Urgent repair works for Left Head Sluice gates and dam site of SPVB Reservoir at B.Mattam, YSR Kadapa (Dt), for the year 2026 - 27
Re-construction of Check Dam across Palar River at Km 29.500 near Samanna (V) in Kuppam (M) of Chittoor District.
Restoration of Jaladurgam tank near Jaladurgam village Peapully Mandal of Nandyal of Nandyal district
Restoration of feeder channel to uracheruvu near kalachatla village Peapully Mandal of Nandyal District
Construction of DLRB at Km.19.300 of Tadipatri Branch Canal (TBC) in Putluru Village & Manal Ananthapuramu District
Formation of Flood banks along the Zurreru vagu from Old Busstand to Nelamatam near Banaganapalli Village and Mandal in Banaganapalli Constituency of Nandyal District.
Annual Maintenance for Operation & Maintenance of Old Venkatanagaram Pumping Scheme for the year 2026-27 in Venkatanagaram (V) in Rajamahendravaram Rural (M)
Desilting, Jungle clearance and culvert works on all Kaletivagu canals in Chakrayapet (M) of YSR District.
Construction of Sri Poleramma temple, Seetalamma temple, Veerabhadra Swamy, Bolleavu temples in the RR Colony at Idupur II Markapur Mandal for Project Displaced Families of kalanuthala Village of Peddaraveedu Mandal, Prakasam District under Pula Subbaiah Veligonda Project
Construction of 1. Anganwadi Centre 2. Shopping complex 3. Rythu Bharosa Kendram 4. Milk Collection Centre 5. GCC store and 6. Arch at Goguladinne R R Centre near Goguladinne village of Markapur Mandal for Project displaced families of Sunkesula village of Peddaraveedu Mandal Prakasam District under P S Veligonda Project
Supply of Man Mazdoors for Watch and Ward of Control room cum rest house, Sluice gate operators and dam site of SPVB Reservoir at B.Mattam, YSR Kadapa (Dt) for the year 2026-27
FDR - 10/2025 Temporary restoration and strengthening of Kalichedu Tank bund near Kalichedu Village in Sydapuram Mandal of SPSR Nellore District.
Repairs, Renovation and Restoration of Alapaleru tank of Chakalapalli (V), Dakkili(M) of SPSR Nellore (Dist.)
Repairs, Renovation and Restoration of Dakkili New tank of Dakkili (V), Dakkili(M) of SPSR Nellore (Dist.)
FDR - 10/2025 Temporary Restoration to Reconstruction of damaged supply channel culvert near Yathaluru H.wada of Yathaluru Village in Venkatagiri Mandal of Tirupathi District
Providing Temporary Protection arrangements to Left-side flank of iver on downstream of Sangam Barrage from Km 1.120 to Km 1.350
Repairs, Renovation and Restoration of Kuppayapalem tank of Kuppayapalem (V), Dakkili(M) of SPSR Nellore (Dist.)
Repairs, Renovation and Restoration of D.Vellampalli tank of D.Vellampalli(V), Dakkili(M) of SPSR Nellore (Dist.)
Repairs, Renovation and Restoration of VKY Samudramtank of VKY Samudram (V), Dakkili(M) of SPSR Nellore (Dist.)
Repairs, Renovation and Restoration of Chikeeranipalli tank of Chikeeranipalli(V), Dakkili(M) of SPSR Nellore (Dist.)
HNSS Project, Phase II Construction of Feeder channels to feed MI Tanks from Kuppam Branch Canal by lift and Gravity and construction of Beeraganipalle Reservoir with capacity of 0.025 TMC in Gudupalli (M) in Kuppam Constituency in Chittoor District.
Construction of internal drains (Main Road-1 and S4, S5 S6 and S7 in Garlapadu Gundlapalli R and R colony at Gundlapalli village, Maddipadu mandal, Prakasam district (2nd call).
Construction of internal drains Main Road 1 and S1 S2 and S3 in Garlapadu Gundlapalli R and R colony at Gundlapalli village Maddipadu mandal Prakasam district 2nd call.
Providing Consultancy Service for Flood routing and Sediment accumulation analysis of Gogarbham Dam, Akashaganga dam, Kumaradhara Dam and Pasupudhara Dams at Tirumala (2nd Call)
Protection work on Palakolluru Minor Drain in Varidhanam village limits of Palakollu Constituency
Formation of Approach Road for the Single Lane Road Bridge connecting the Vasista Left Flood Bank near Pedalanka Village Limits of Elamanchili Mandal in West Godavari District
Construction of Revu at Durgamma Temple on Vasista Right Bank in Wakalagaruvu Village Limits of Elamanchili Mandal in West Godavari District
Repairs and Raising of the Causeway across the Vasista River at Pedalanka Village Limits of Elamanchili Mandal in West Godavari District.
FDR -10/2025-Temporary Restoration and Repairs to damaged shuttering arrangements to DR Channel Head Regulator at Thurimerla Drop in Dagadarthi mandal of SPSR Nellore District.
FDR -10/2025- Temporary Restoration & Repairs to Damaged Shuttering Arrangement to Eastern channel OT sluice system near Buchireddypalem Mandal of SPSR Nellore District
FDR -10/2025-Repairs to Damaged Shuttering Arrangement to Ramannapalem yagarla system near Ramannapalem (V) in Kodavalur (M) of SPSR Nellore Dist
FDR -10/2025- Temporary Restoration & Repairs to damaged shuttering arrangements to Ana Dividing system near Mudivarthi Village in Vidavalur mandal of SPSR Nellore District.
FDR -10/2025- Temporary Restoration To Replacement Shuters To Pyderu Anicut Near Peyyalapalem In Kodavaluru Mandal Of Spsr Nellore District
FDR -10/2025- Repairs to Damaged Shuttering Arrangement to Horse Shoe Regulator near Reddypalem Village Kodavaluru Mandal of SPSR Nellore Dt