Loading…
Loading…
3,271 results • Latest
Providing BT Roads with hot mix process to Balance roads of Siddhartha Vari Street and Connecting Road to Thotavari Street 11th line at Nandamuri Nagar in 58th Division
SDSTPS-3X800MW- Providing filter point and supply, laying of HDPE water pipe line from Pidathapoluru sachivalayam to Nelatur Harizanawada SC colony.
Construction of New Toilets at Burial Grounds in 5th Division in AE - 8 Section. 8th Call General Funds
Repairs and Painting to Center Dividers and Foot Paths at Various Road in AE-9 Section, Works Division-3 area. 1st Call General Funds
Package-XXXIX Construction of Flood Protection and Strengthening of Inspection of Right Bank of River Krishna E1 road (Chainage 4+990 to CH 7+200) on Lump sum basis (% Contract ) including DLP of 2 years in Amaravati Andhra Pradesh
Providing DWF through 100 percent FHTCs to Chinnapareddipalli Habitation in Penukonda mandal
Supply and delivery of RCC Precast Movable Divider blocks for various locations in AE-3 Section, Circle-1 area. (1st call)
Providing Road Marking, Rumble Strips and Zebra Crossing at various location from Varadhi to APSRTC Bus Stand in Work Division-3 area. 1st Call General Funds
Extension of Ayyalanadu park at Beside R.T.C. Bus stand in ward no.9 in Srikalahasti Municipality
Construction of CC Road, Drains & Culverts to Cross Roads In Annavaram Village of Rompicherla Mandal.
Providing Painting to Centre Divider on High Tension Line Road in AE-8 Section, Works Division-3 Area. 1st Call General Funds
Replacement of Life over batteries to AE-BIRRD Section and AE-SKVST Section in ESD SBH, TTD, Tirupati for the year 2026-27
Supply and Delivery of RCC Precast Movable Dividers for Various Locations in AE-9 Section Work Division-3 area. 1st Call General Funds
Establishment of NF/Organic Store at AP Secretariat, Amaravati, Guntur District.
Providing white line markings and studs from Sitara junction to milk project and chitti nagar junction in Circle-1 area. (1st call)
Annual maintenance of Toilets and foot paths and Temporary Qlines at GG Dam circle to ATRH Tirumala for the year 2026-27
Annual maintenance of Vaikuntam Queue Complex-2 ,Sarvadarshanam shed & New kitchen block at Tirumala for the year 2026-27
Improvements to Kondaveeti vagu from Km 2 500 to km 3 500 in village limits of tadikonda Village of tadikonda mandal of Guntur District
Improvements to Kondaveeti vagu from Km 0.000 to km 1.000 in village limits of lam Village of tadikonda mandal o Guntur District
Improvements to Kondaveeti vagu from Km 4 to km 5 in village limits of tadikonda Village of tadikonda mandal o Guntur District
Improvements and strengthening of Musurumilli Main Canal and Distributaries & Left Branch Canal for smooth running of water to Tailenders
Restoration of Irrigation System for effective water Regulation including Monitoring and Management of offtake in Km 53 300 to Km 107 420 118 000 of Madakasira Branch Canal under HNSS Phase II in Sri Sathya Sai District for the year 2026 2027
Improvements to bunds and Modernisation of OT Sluices and laying of pipes in between Km 53 000 to Km 90 000 of MBC in Lepakshi M of Sri Satya Sai Dist
HNSS Phase II Madakasira Branch Canal Estimate for Improvement of Bund From Km 91 300 to Km 103 000) in Sri Sathya Sai District of AP
HNSS Phase II Madakasira Branch Canal Estimate For Improvement of Bund from KM 79.800 to KM 90.000 in Sri Satys Sai District of AP
HNSS Project Phase II Strengthening of the canal From Km 442 400 to Km 443 700 of HNSS Main canal for the year 2026 2027 in Sri Sathya Sai Dist.
Strengthening of Gates at Km 0 00 and Pungnaur Branch canal OT and Km 26 200 under HNSS Project Phase II in Sri Sathya Sai Dist
HNSS Project Phase II Strengthening of offtakes on HNSS Main canal From Km 400.500 to Km 440.000 Excluding P 15 and 16 Tunnels for the water season 2026-2027 in Sri Sathya Sai Dist.
HNSS Phase II Madakasira Branch canal Estimate for Improvement of Bund From Km 65 800 to Km 79 000 in Sri Sathya Sai Dt of AP
Restoration of Irrigation system for effective water regulation including Monitoring and Management of offtake in Km 118 000 to Km 143 000 143.400 of Madakasira Branch Canal under HNSS Phase II in Sri Sathya Sai District for the year 2026 2027. .
HNSS Phase II Madakasira Branch canal Estimate for Improvement of Bund and removal of silt in From Km 53.600 to Km 65.000 in Sri Sathya Sai Dt of AP
HNSS Phase II Madakasira Branch canal Estimate for Improvement of Bunds From Km 118.000 to Km 143 000 143 400 in Sri Sathya Sai Dt of AP
Flood Precautions to Gowthami Left flood Bank from K.M. 0.000 to K.M. 34.000 in G.L.B (U) Section Alamuru for the year ending 30.11.2026
Flood Precautions to Vasista Left Flood Bank from K.M. 0.000 to K.M. 47.600 in V.L.B (U) Section Gopalapuram for the Year ending 30.11.2026
Improvements and strengthening of inspection path in between K.M 54.200 to K.M. 56.600 of vasista left bank in Nagullanka village to Vadruvulapalli limits of P.Gannavaram mandal in Dr.B.R. Ambedkar Konaseema district
Improvements and strengthening of inspection path in between K.M 51.300 to K.M 53.600 of vasista left bank in Mondepulanka to Nagullanka village limits of P.Gannavaram mandal in Dr.B.R. mbedkar Konaseema district
Improvements and Repairs works to Protection of Vulnerable bank at K.M 34.500 of G.L.B in Kulla village K. Gangavaram Mandal, Dr.B.R. Ambedkar Konaseema District
Flood Precautions in V.L.B (Lower) Section, Razole of Vasista Sub- Division, Razole for the Year 2026 in Dr. B.R. Ambedkar Konaseema District.
Flood precaution to Akhanda Godavari Right Bank from K.M. 0.200 to K.M. 40.200 of AGRB Section, Kovvuru East Godavari District for the year ending 30.11.2026
Improvements and Repairs Work- Maintenance of Coringa Tidal Regulator in Yanam and G.L.B of Vulnerable bank from K.M.55.000 to K.M..60.000 Thalarevu Mandal, Kakinada District.
Flood Precaution Estimate for Supply of flood materials to Additional Flood stores at Narasapuram of the V.R.B. (L) Setion, Narasapuram, Under the Control of Vasista Sub- Division for the ensuing flood of year 2026 in West Godavari District
Flood Precautions in V.R.B (U) Section, Siddantham of Vasista Sub- Division, Razole for the Year 2026 in West Godavari District.
Flood Precaution Estimate for Supply of flood materials to Additional Flood stores at Doddipatla of the V.R.B. (L) Section, Narasapuram, Under the Control of Vasista Sub- Division for the ensuing flood of year 2026 in West Godavari District
Flood precautions and maintenance to the PIP Flood Bank from K.M. 0.000 to K.M. 40.575 in GRB (L) section Muramulla for the year 2026-27
Temporary Protection to the scoured GRB flood bank in Kundalaiswaram Village limits of Katrenikona Mandal in Dr. B.R. Ambedkar Konaseema District
Flood Precautions to Gowthami Right Flood Bank from K.M. 0.000 to K.M. 51.000 in G.R.B (U) Section Kothapeta for the year ending 30.11.2026
Flood Precaution to Akhanda Godavari Left Bank from K.M. 18.400 Bobbilanka to K.M. 41.735 Purushothapatnam village limits in Sithanagaram Mandal of E.G. District for the year ending 30.11.2026
Special Repairs & Improvements to the approach road to the reservoir, bund and toe drain of the K.E Madanna Jalasayamu (Krishnagiri reservoir) for effective monitoring & functioning of the reservoir system in Krishnagiri mandal of Kurnool district.
Puttur Municipality - Scheduled Caste Sub Plan (SCSP)-2024-2025 Grant - Construction of C.C Drain from Community Toilet to Electric Pole No. UI/14 at C.T.R Netham in 11th Ward of Puttur Municipality.