Loading…
Loading…
3,271 results • Latest
Construction of CC Road from Plot No: 801 to 826 in New Upperagudem Colony in 20th Ward of Tuni Municipality.
Desludging of Wet Silt and Sludge from inlet chambers, grit chambers and sump at Pandaripuram,Electricity colony and Ramalingeswara Nagar Drainage Pumping stations in Circle III area
Procurement of Rail track of side arm charger-1 and 2
Supply Fabrication and Installation of Gates and Platforms and Staircase Handrails at Rajiv Nagar Drainage pumping Station in circle II area 2nd call
Fabrication & replacement of worn out liner and mother plates, deck/sealing sheets in various chutes & conveyors, in vibrating feeders and hoppers of Wagon Tipplers 1-4, stringers supports & fabrication, reconditioning & refixing of sump pumps as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026 in M-I(Conveyors) Sub-Divn.,-MM (CHP)/Stage-I&II/ Dr. NTTPS
Providing of Scour points at various locations in 47, 49, 50 and 56th divisions under AE-V section Circle-I area.Rc.E6-106979/2026(1st call)
FDR Temporary Restoration Repairs to the damaged and eroded bank and desilting in Pyderu Major drain Km. 24.530 to Km. 25.200 near North Amalur Village in Allur Mandal of SPSR Nellore District
Temporary Restoration and Improvements and Strengthening of Kovur Tank bund near Kovur Village in Kovur (M) of SPSR Nellore District
FDR Temporary Restoration Repairs to the damaged and eroded bank and desilting in Pyderu Major drain in between Km. 25.225 to Km. 25.700 near North Amalur Village in Allur Mandal of SPSR Nellore District
Repairs, Renovation and Restoration to Sagaturu Tank in Sagaturu Village Ozili Mandal Nellore District
FDR Temporary Restoration Repairs to the damaged and eroded bank and desilting in Pyderu Major drain Km. 22.950 to Km. 23.700 near Beerumgunta Village in Allur Mandal of SPSR Nellore District
FDR Temporary Restoration Repairs to the damaged and eroded bank and desilting in Pyderu Major drain from Km.23.720 to Km.24.500 near Beerumgunta Village in Allur Mandal of SPSR Nellore District
FDR Temporary Restoration Repairs to the damaged and eroded bank and desilting of Pyderu Major drain from ATS Km. 26.500 to Km. 25.700 near North Amalur Village in Allur Mandal of SPSR Nellore District.
FDR Temporary Restoration Repairs to the damaged and eroded bank and desilting of Pyderu Major drain on D/s side of Nellore-Allur road bridge near Beerumgunta Village in Allur Mandal of SPSR Nellore District.
Laying of Main Approach CC Road from Chainage 200/545 to 445/545 at YSR Police Colony in 3rd Division of Kadapa Municipal Corporation
Providing of arrangements for VVVIP visits at Sri PAT, Tiruchanoor for the year 2026-27
Construction of Both Sides CC Drain Door no 162 Bonela Swarajyam House to Door N.o 141 Jalagadugula Laxmi in SweeperVeedhi in Ward No.10 of Parvathipuram Municipality. (2nd Call)
Urgent repairs to Bheemunipatnam- Narsipatnam road from km 72/0 to 73/0 in Anakapalli District.
Construction of CC Road Door no 162 Bonela Swarajyam House to Door N.o 141 Jalagadugula Laxmi in Sweeper Veedhi in WardNo.10 of Parvathipuram Municipality.
Laying of CC Drain both sides from Door no.108 Velagada Gopi house to Door no.118 Rachamalla Padma Vacant site at Indiracolony in ward no.12 of Parvathipuram Municipality (2nd Call)
Laying of 450mm CC Drain from gadhi appanna house (D.No 133) yalla ramu house (D.No 20-22) at nandamuri colony in WardNo.7 in Parvathipuram Municipality
Construction of Both Sides CC Drain Door no 182 Kuramana Raani House to Door N.o 110 Thota Gowramma in Pedha MadhigaVeedhi in Ward No.10 of Parvathipuram Municipality. (2nd Call)
Providing Main Roads & Internal Roads for Layout Sy.No.15/2B1 extent of 21.00 Ac. in Mukthinuthalapadu in Division No.2
Providing Water supply Facility to the public after cremation and Construction of Additional shed with Truss structure, GI sheetsat SC Burial Ground beside railway station, 4th ward of Parvathipuram Municipality
Construction of 450mm Drain from chavitha Lamxi House to D.no 127, Harijana durga house Including Cross culvert at D.noHarijan durag house SNP Colony, 21th ward of Parvathipuram Municipality. (2nd Call)
Reconstruction of Surplus Weir (I.C) of Kotha Tank near Mustalagangavaram H/O Avulamanda Village in Kurichedu Mandal Prakasam District
Laying of 110 mm dia HDPE Pipeline and Laying of CC road from H.No:51/967-A7-2B to H.No:51/967-A7-14 at Illuru Nagar and H.No:51/952-42 to H.No:51/952-43A at P.V Narasimha Rao Nagar in Ward No.43.
Construction of SW CC Drain from D.No 174 (Patnayakuni vimala kumari house) to D.No 135 (Devakoti sankar rao house) in vijayaramaraju colonyin Ward No.8 Parvathipuram municipality (3rd Call)
Temporary Restroration of Kasaiah Tank near Marlapalem Village in Kurichedu Mandal Prakasam District
Providing of New 20 Nos ACP Holo Name Boards and 54 Nos 3M Night Glow Stickers Size 3x3 feet on the Central Medians from ITI Circle to Airport and Pipe line work at YS R Park and Prakruthi Vanam Nursery in Kadapa Municipal Corporation
Temporary Restroration of Surplus Weir of Kurichedu Big tank Kurichedu Village in Kurichedu Mandal Prakasam District
Construction of CC ROAD Gembali Ramesh House door no 100 to Door N.o 112 Pondoori Ramulamma in Godagala veedhi WardNo.10 of Parvathipuram Municipality. (2nd Call)
Construction of CC Road Door no 182 Kuramana Raani House to Door N.o 110 Thota Gowramma in Pedha Madhiga Veedhi inWard No.10 of Parvathipuram Municipality. (2nd Call)
Construction of New CT Scan Building in Area Hospital,Kuppam ,Kuppam Mandal in Chittoor District,Estimate Cost Rs 65.00 Lakhs
Construction of CC Drain Gembali Ramesh House door no 100 to Door N.o 112 Pondoori Ramulamma in Godagala veedhi WardNo.10 of Parvathipuram Municipality (2nd Call)
Construction of CC Road from Door no 19-107 Yalla Papamma House to Door N.o 20-22 Yalla Ramu House in Nandamuri Colonyin Ward No.07 of Parvathipuram Municipality (2nd Call)
Laying of 160 mm dia HDPE pipe line from 49-50-a-67a to 49/50-A-12-B & laying of 110 mm dia HDPE pipe line from H.NO 49-1-87A to 49-1-88A , 49/50-A-49-B to 49/50-A-42-A, D,No.49-50A-87F-12-A2 to D.No.49/50A-87-A1 at Laxmi Nagar, Ward No.24 in Kurnool Municipal Corporation.
Supply and Delivery of LED Street Lights, Drivers, PCBs for the Street Light maintenance in the limits of Kadapa Municipal Corporation
FDR-Estimate for Supply, Fabrication and Erection of Flap Shutters on Left Bank of YerraCalva River at km 26.050 in Singavaram(V) limits of Nidadavole (M) in East Godavari District.
Providing HDPE Pressure main from Existing valve in Gravity Main 3 at Eddupenta X road to Borravani Kunta near Eddupenta Village Dhone Mandal Nandyal District
Restoration and Extension of left supply channel of Venkatapuram MI tank up to Gummakonda fields in Dhone Mandal Nandyal District
Restoration of Marrikunta near Pendekal Village Bethamcherla Mandal Nandyal District
Providing Pipeline from Udumulapadu MI Tank to Ura Kunta near Venkatanayunipalli Village Dhone Mandal Nandyal District
Construction of SLB at Km.27.250 on Appapuram Main Channel near Vangipuram (V) in Prathipadu (M) of Guntur (District)
Temporary Restoration of Right Bank of Dornapau Vagu near East Veerayapalem Village in Darsi Mandal of Prakasam District.
Temporary Restroration of Tank Bank of Tanamchinthala Tank near Tanamchinthala Village in Darsi Mandal Prakasam District
Temporary Restroration of Surplus Course of Village Tank in Thurupu Venkatapuram Village in Darsi Mandal Prakasam District
Temporary Restroration of Tank Bund of Kurichedu Ura Tank in Kurichedu Village in Kurichedu Mandal Prakasam District
Temporary Restroration of Nagari Tank of Bayyaram Village in Kurichedu Mandal Prakasam District
Temporary Restroration of Desilting of Alugu Vagu of Paparayudu Tank near West Veerayapalem Village in Kurichedu Mandal of Prakasam District