Loading
Loading…
Loading…
131 results • Recent activity
Construction of VRB at 10.200 Nagrasar Disty
Removel of Silt And overburden soil form the water course of Sahwa Disty ( 6SHD, 13SHD and 14 SHD)
Silt and overburden soil from the water course of dhheerwas minor (6DHM,7DHM ,9DHM and 11DHM)
Silt and overburden soil from the water course of dheerwas minor (2DHM Diggi A and Diggi B)
Silt And overburden soil form the water course of Dheerwas minor ( 1DHM ,3DHM,4DHM,5DHM AND 10 DHM)
Regulation and petroling of Ch. KRA lift Canal Km 63.300 to 78.300 , Punsisar mr, Punras Mr, Bhurawas mr. and Bhamran Minor 2025-26