Loading…
Loading…
14,644 results • Latest
ELECTRICAL AND FUEL SYSTEM SPARES
Repair and Overhauling Service - Multifunction Machines MFM; REPAIR AND CALLIBRATION OF ANEMOMETER; Yes; Service Provider Premises
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; PA SYSTEM INSTALLATION; Service Provider
Writing Pens (Q4), Sticky Notes (V2) (Q4), Register (V2) (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Photography paper Conforming to IS 6139 (Q4), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Correction Tape (V2) (Q4), File/Folder (V3) (Q4), Lamination Films (V2) (Q4), Markers and Highlighters (Q4), Glue Stick (V3) (Q4), Double sided tape (Q4), Educational Teaching Chart (Q4), Stationery Scissors (V2) Conforming to IS 989 (Q4), Trophy (V2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair and Overhauling Service - Backhoe Loaders (V2); REPAIR OF JACK WHEEL(GSE); Yes; Buyer Premises
Solar farrow Light Trap Big
Repair and Overhauling Service - REPAIR OF TIL CRANE 10 TON; REPAIR OF TIL CRANE 10 TON; Yes; Buyer Premises
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - 4 CORE ARMOURED ELECTRICAL CAB LE (XLPE); 4 CORE ARMOURED ELECTRICAL CAB LE (XLPE)
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Repair and Overhauling Service - Multifunction Machines MFM; REPAIR OF PLC CONTROLLED AUTOMATIC ENG COMPRESSURE WAS UNIT; Yes; Service Provider Premises
Repair and Overhauling Service - built up trucks; TATA MOTORS; Yes; Buyer Premises
Optical Fibre Splicing Machine (V2) as per TEC 88090:2012 (Q2) (3 (3 ))
Repair and Overhauling Service - COACH PASSENGER 52 SEATER; COACH PASSENGER 52 SEATER; Yes; Buyer Premises
Repair and Overhauling Service - built up trucks; SML; Yes; Buyer Premises
Blade, Special bolt, Blade Holder small, Wheel Bearing, Hydraulic cylinder, Oil seal 3N2402D, Oil Seal 3N3403D
Repair and Overhauling Service - built up trucks; EICHER; Yes; Service Provider Premises
MAT SURFACE INDOOR BADMINTON COURT WITH SHED
PROCUREMENT OF MISC. OFFICE ITEMS
Paraffin wax, melting 56 degree centigrade to 60 degree centigrade in Kg
Amoxycillin 875 mg+ Clavulanic acid 125 mg tablet capsule
Cervical Collar (Q2)
Digital Medical X - Ray Films (V3) (Q2) ( ( 3 3 ))
Sacubitril 97 mg+ Valsartan 103 mg Tablet
Glucosamine 250 mg+ Chondroitin sulphate 200 mg capsule
Three Way Stopcocks (Q2)
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Fabric (Jacket Field Dress, Trousers Field Dress and CAP) (V2) (IAF) (Q2) (3 (3 ))
Repair and Overhauling Service - built up trucks; TATA MOTORS; Yes; Buyer Premises, Service Provider Premises
Manpower Outsourcing Services - Fixed Remuneration - Healthcare; Counsellor; Post Graduate
Anklet Web as per IAF specification (Q2), anklet synthetic black (Q3), Light Weight Web Equipment as per Defence Specification (Q3) (3 (3 ))
INSTALLATION OF TOTAL TECHNICAL LIFE EXPIRED MIG-21 AIRCRAFT FOR DISPLAY PURPOSE AT 505 SU
Dunnage Pallets Made from Recycled Plastic Wastes for Warehousing Applications as per IS 16058 (Q3)
Repair and Overhauling Service - PARTICLE COUNTER; PARTICLE COUNTER; Yes; Service Provider Premises
PATCH CABLE FOR P109, P104 AND P119 TEMPRATURE SENSORS, PATCH CABLE FOR AIRCRAFT RECTIFIERS, TECHNOLOGICAL PLUG FOR CHECKING AUTOMATIC ENGINE START
Online UPS (>10 KVA) With Battery (Q2) (3 (3 ))
VIDEO CONFERENCING SYSTEM WITH TOUCH USER INTERFACE AND EXTERNAL MICROPHONES
Repair and Overhauling Service - REPAIR OF ASHOK LEYLAND COACH 52 SEATER; REPAIR OF ASHOK LEYLAND COACH 52 SEATER; Yes; Buyer Premises, Service Provider Premises
PROCUREMENT AND INSTALLATION OF ANTI BIRD NETTING
Stable Rubber Mats (Q3)
KODAK INDUSTREX FIXER REPLAMINCIER