Loading…
Loading…
4,718 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICG Ship C-404 at Beypore; Overhauling ME Turbocharger; Service Provider
LP OF NAVAL STORE ITEMS
PROCUREMENT OF CLOTHING STORE ITEMS AGAINST ARD
Repair and Overhauling Service - Load testing of deck equipment; Load testing of deck equipment; Yes; Buyer Premises
Repair and Overhauling Service - cars; H-053 Securing of window wiper Fresh water line; No; Buyer Premises
Repair and Overhauling Service - diesel generators- DG Sets; L- 215 PORT DA DYNAMO REPAIR AND L-216 INSTANT WATER HEATER REPAIR; No; Buyer Premises
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS RAJDHWAJ; H-175; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS RAJDHWAJ; H-186; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS RAJDHWAJ; H-187; Service Provider
procurement of paint
Repair and Overhauling Service - Multifunction Machines MFM; E15 yearly routine on FM 200 System; No; Buyer Premises
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - DHQ 10 ICGS RAJDHWAJ; E 120; Service Provider
Stationary Lead Acid Batteries (with Tubular Positive Plates) in Monobloc Container (V2) Conforming To IS 13369 (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WB-507; E07 Wheel House AC Plant is not producing adequate cooling effects following jobs to be carried out 1 Check AC system thoroughly for leakage of Freon Ga..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS C-428; L 012 Ship main Broadcast System is non operational On investigation by SS it was found that main power amplifier board of amplifier make Phi Audiocom Type 5..
Anti Fatigue Mat (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - C-401 H 034 01 in nos blast tank with stand to be fabrication along with securing clamp for changing of diving set BASSCA ELSA as per sample water and drain valve to be ..
Pipe Clip, 500339542, LP Of Main Engine Spares For ACV H-187
Procurement of ARS items for ICGS Vizhinjam
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin
GYRO-LOG ES Repeater LCD Display, Part No. DR03- GYLOGES
Test Valve (MBV5000-1111, Part No. 061B7000)
Repair and Overhauling Service - ANNUAL SERVICING AND MAINTENANCE OF 01 SART INCLUDING REPLACEMENT OF BATTERY; SART MAKE-SAMYUNG MODEL-SAR-09; Yes; Buyer Premises
Custom Bid for Services - UNDERTAKING DEFECT RECTIFICATIONOF HULL DEFECTS (H-069 TO H-075) ONBOARD ICGS C-155 Similar Category Repair and Overhauling Service
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - IC 305, IC 306 C/O ICGS murud Janjira, Near Agardanda Jetty; Load test of stainless steel wire rope sling 6x19 construction, machanically ferrule spliced with thimble; ..
procurement of shore supply cable
Catering Service per Packet based - Veg; Snacks/High, Tea; Snacks Packet
Repair and Overhauling Service - FABRICATION OG COMPARTMENT FLOORING WARDROOM ALLEYWAY WARDROOM OFFICER ALLEYWAY ENGINE ROOM ALLEYWAY MCR MAGAZINE ALLEYWAY EXISTING FLOORING TO BE RENEWED WITH FIRE RESISTANT FLOORING AND CERTIFICATES TO BE PROVED PRI..
ESD Mat (V2) (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Repair of 06 nos EO Devices onboard Aadesh Class ICG Ships; Service Provider
PROCUREMENT OF ARS ITEMS AGAINST
SPARES FOR W6 ROUTINE OF MAIN ENGINE
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation, Networking system; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 0; Yearly routine of both Gear Box; Buyer
Passenger Cabin Compressor (Make- Bock Germany), Control Cabin Compressor (Make- Sandan Germany)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - DHQ-10/C-414 H-148 & H- 149; H 148 Top surface of ship Gemini is deteriorated view exposure to sea water Gemini to be painted and stickering to be done Indian Coast Guard..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - DHQ-10/C-424 L-026; L- 026 Oily water separator motor is not starting and trips during the starting process suspect motor-gear box failure DI-DR and overhauling of OWS be..