Loading…
Loading…
14,336 results • Latest
Valve Assembly - EL-60
ADEN/FL sub division: Zonal work on FL Sub Divn.- Phulera station and Phulera to Hirnoda (Excl.) ,Phulera to Renwal (Incl) and Phulera to Madar (Excl.)Staff Quarter & Service buildings for Sanitary work, all type of repair work and Horticulture work and Any type of road work as per CPWD-DSR for the period up to 30.06.2028 (In Jurisdiction of SSE (Works) FL Zone-12
Supply and installation of PCB inspectio [Supply and installation of PCB inspection microscope can be used to check the removed/defective PCB cards of MPCS/SIV units for trouble-shooting and fault analysis. It can be used as an optical or digital tool to verify solder joint quality, micro- defects, and take photos for storage. Detailed specification as per annexure enclosed.
CLOBETASOL 0.05% WITH MICONAZOLE 2% 10 GMS OINT
WEARING PLATE FINISH
AMBROXOL 7.5MG/ML DROPS 15 ML