Loading…
Loading…
13,858 results • Latest
1) LEFLUNOMIDE 10 MG TAB, 2) LEFLUNOMIDE 20 MG TAB, 3) TOFACITINIB 5 MG TAB,4) TOFACITINIB CITRATE 2% W/W GEL 10 GM & 5) TOFACITINIB EXTENDED RELEASE 11MG TAB
Bolt & Nut Full HEADED 25x 80
Construction of Road Over Bridge with 1 x 24.0 m composite girder (Sanakastulli side) + 1 x 42.0 m composite girder (Railway span) + 1 x 24.0 m composite girder in Railway portion at Km 592/16-18 in lieu of LC No. 302, and proposed span of 4 x 24.0 m RCC T-beam girder on Sanakastulli side and 14 x 24.0 m RCC T-beam girder on Mandiapalli side for approach portion at Km 592/20-22 between Chatrapur (CAP) and Jagannathpur (JNP) stations (Khurda-Palasa section) on the Howrah-Visakhapatnam Main Line under Khurda Road Division.