Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
19,754 live7,675 closing this weekmost from Central Railway and Western Railway
19,754 results • Latest
Ophthalmic Operating Microscope with standard accessories & 05 Year warranty.
ADVANCED ELECTRICALLY OPERATED DENTAL CH [ADVANCED ELECTRICALLY OPERATED DENTAL CHAIR UNIT WITH ALL ESSENTIAL EQUIPMENTS AND NECESSARY ACCESSORIES]
Supply installation and commissioning of Spring Load Deflection Testing Machine capacity 20 Ton
MS Wire (for general Engg. Purpose) 1.6 mm dia.,16 SWG - Soft. Material and Specification : IS: 280 / 2006 (Rev. 4),Amend. No. 1 of August 2009, The wire shall be hot dipped galvanized (light coated), Soft.
POVIDONE IODINE SOLUTION 5 % 100 ML,Disposable Needles 26G,ECG Paper Roll 210 MM x 20 Mtr,Povidone Iodine 7.5% Surgical Scrub 500 and CHLORHEXIDINE GLUCONATE 0.3% V/V .
Hiring of vehicle for transportation of Railway material from anywhere to anywhere as and when required, for a duration of 02 (two) years
Procurement of Door check spring for BCN/BCNA Wagon etc.
Supply and installation of new locks in the existing IRS type point machine cover and opening of locks with key system (02 nos key per lock)
Procurement of THREE TAPER KEY FOR BOBYN WAGON etc.
Supply and Installation of M.S. GP Mesh with plastic shed air duct cover for exhaust fan window
Procurement of Swing Door Frame with Panel (L.H.) etc.
Procurement of Pull Rod Long for Horizontal Lever etc.
Measuring and Monitoring Relay (Voltage Phase Control,3 Phase, Rated Voltage:1000 Volts, Aux. Voltage:110V AC/DC for LHB AC Coaches. MakeBD9080 of M/s DOLD
EARTHING CABLE COMPLETE 70 SQ.MM (FOR LHB COACHES). as per Drg.No.
Cleaning and Washing of Loco Body, Filter, Radiator, Lookout Glass of Three Phase Loco (WAP-7 & WAG-9) at Electric Loco Shed, West Central Railway, New yard, Itarsi" (for a period of 2 years).
Disconnecting and earthing device, 8 pole, 2 way, no-OFF on load, 63A 750V AC (1000V insulation), 2NO + 2NC with heavy handle and pad locking arrangement. In earth
SET OF SPARES OF OVERHAULING OF SUSPENSION TUBE ASSEMBLY etc.
Supply of 160 KVA,11/0.416 KV, 3 Phase, 50 Hz, Outdoor type Distribution transformer complete, ONAN cooled, Delta/Star (Dyn 11 Group), Copper wound , plinth mounted Transformer with first fill of Transformer oil and with standard fittings conforming to IS:1180 (Part-1)/2014 latest, Energy Efficiency: Level 2 of Table 3 of amendment No.4 March 2021 (Details as per enclosed Annexure)
WATER SEPARATOR HOUSING OF 1400 HP CATERPILLER ENGINE, CAT PART NO: 2337973, MAKE: CAT.
Readiness and Up-Gradation of ICF coaching stock for upcoming Kumbh mela at Ujjain, Nashik and Haridwar
All type of connections including UIC coupler with proper dressing, testing, commissioning, rectification and other related work of Power Panel/ DA Set Panel/ SBC/ HOG Panel/ Set of Panels (HV & LV Panel) in LHB AC/ Non-AC and Amrit Bharat coaches at RCF,Kapurthala
1) S&T portion of work in connection with Proposed rebuilding of BGML loading standard girder of Br.No.1383 UP in DSI-PDU section on the basis of residual fatigue life criteria for running 25 T axle load wagons @ 100 kmph for achieving Mission 3000 MT - Railway Bridge works. 2) S&T portion of work in connection with Proposed replacement of BGML loading standard girder bridges Br.No.784 DN bet SNM-VBL and Br.No.836 UP bet VBL- DNV in RGDA-VZM section on the basis of residual fatigue life criteria for running 25 T axle load wagons @ 100 kmph for achieving Mission 3000 MT - Railway Bridge works. 3) S&T portion of work in connection with Proposed replacement of existing steel girders of span 12.20 mtr by PSC slabs on Br. Nos.1666Up, 1666DN, 752S/L, VSP8UP, VSP8DN, VSP14UP, VSP14DN, VSP24UP, and VSP25UP and 1652 Siding on main line and Waltair MYD lines. 4) S&T portion of work in connection with Rebuilding of 8 No minor bridges into RCC box Bridges between PSA - VZM on Main line. Bridges: 1217A DN, 1225 UP, 1302 DN, 1481 UP, 1481 DN, 1408 UP, 1435 UP and 1443 UP. 5) S&T portion of work in connection with Proposed replacement of girders of Major Bridge No.1383 DN (BGML) in PSA-VZM section in connection with Mission 3000 MT on the basis of residual fatigue life criteria of bridges of age more than 50 years old & bridges on more than 40 GMT.
Supply, installation and commissioning of Industrial RO water purifier plant
Ipratropium Bromide 500mcg and Levosalbutamol 1.25mg per 2.5ml Respules
TEE-REDUCING PIPE as per Drg.No. 120279 ALT Ba specn: PURCHASE SPESIFICATION NO.MISC-479 REV-NIL