Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
18,338 live7,489 closing this weekmost from Central Railway and Southern Railway
18,338 results • Latest
(1) SUPPLY OF 21 KHZ/25 KHZ RECEIVER COILS WITH 15 MTR CABLE for SSDAC (2) SUPPLY OF 21 KHZ/25 KHZ TRANSMITTER COILS WITH 15 MTR CABLE for SSDAC (3) Supply of PD-2 CARD for SSDAC (4) Supply of PD-1 CARD for SSDAC (5) Supply of DC-DC CONVERTOR MODULE for SSDAC (6) Supply of COMMUNICATION CARD COM-1 for SSDAC (7) Supply of COMMUNICATION CARD COM-2 for SSDAC (8) Supply of RELAY DRIVE CARD RD1 for SSDAC (9) Supply of COM CARD for HASSDAC (10) Supply of 24V-48V PS Card for HASSDAC (11) Supply of DC-DC converter for HASSDAC (12) Supply of RD-1 CARD for HASSDAC (13) Supply of 24V-48V PS Card for HASSDAC. above all items required of G.G.Tronic make.
21.6/30.24 MVA, 132KV/27 KV, 50Hz, Single Phase ONAN/ONAF type Traction Power Transformer
Glass Marking Pencil, white. Brand : APSARA Make or similar.
5 Seater sofa ,Executive Revolving Chair,Cantilever office chair Non-revolving,Visitor Chairs (Non Revolving.
10V AC LED Signal Lamps for Subsidiary Colour Light Signals (Integrated) compatible with AC LED ECR as per RDSO Specification No. RDSO/SPN/153/2023 Rev. 5.0 or latest
[1] S&T portion of work in connection with Provision of 06 m wide FOBs at VBL & PVP stations under Amrit bharath scheme.[2] S&T portion of work in connection with Extension of Existing platforms to accommodate full length of coaching train at SNM station on RV line of WAT Divn. [3] S&T portion of work in connection with Raising of High level platforms 02,03&4 and 05 platforms at ALM and KPL stations over Main line. [4] Name of the work: S&T portion of work in connection with Provision of CCTV Cameras parcel scanners and battery operated trolleys at parcel offices over Waltair Division.Locations: (1) VSKP (2) VZM (3) CHE (4) VBL (5) PVP.
BZA-DRUG (PH NO.:49087) TERBINAFINE HYDROCHLORIDE 1% CREAM CONTAINING MINIMUM OF 10 GM
SET OF DOOR a)LEFT COMPLETE Conforming to RCF Drawing No. LW56351, Alt.- b b)Door RtGHT COMPLETE Conforming t0 RCF Drawing No. LW56352, AIt.- c.
Ceramic floor mounted one piece commode with (SOFT CLOSE HYDRAULIC SEAT COVER) and cistern with all fitting Make HINDWARE (Model S-220)/ Parryware/JOG/Cera or equivalent market leading brands.
Development of OHE model to facilitate the training at Kalumna Depot.
Set of fasteners consisting of (1)Hexagonal Head Bolt Of Length 40mm, Dia-8mm, Pitch - 1.25mm, Half Threaded, Along With Suitable Nut, One Flat Washer & 2 Spring Washer, Grade 10.9, Qty-1000 Nos. (2) Hexagonal Head Bolt Of Length 40mm, Dia-8mm, Pitch - 1.25mm, Full Threaded Along With Suitable Nut, One Flat Washer & 2 Spring Washer, Grade 10.9, Qty-1000 Nos. (3) Hexagonal Head Bolt Of Length - 25 Mm, Dia8mm, Pitch - 1.25mm, Along With One Flat Washer & 1 Spring Washer, Grade 10.9, Qty-1000 Nos. (4) Hexagonal Head Bolt Of Length 40 Mm, Dia 6 Mm, Pitch - 1.0 Mm, Half Threaded, Grade 10.9 With 02 Spring Washer & 01 Flat Washer, Qty-1000 Nos.
Jumper Cable support Link Assembly (Stainless Steel) To ICF Drg No. LWSCWAC/EOG-7-1-006/Col- I, Alt-a. Packing instruction SPI220.
ROOF MOUNTED AIR CONDITIONING SYSTEM WITHOUT TROUGH Specification- RDSO Specn No- RDSO/2007/EL/SPEC/0055, Rev.-2
SUPPLY, INSTALLATION AND COMMISSIONING OF OVERHEAD 15 TON EOT CRANE.
Foot Step arrangement of disabled compartment of LSLRD coaches as per Drawing No. MLR24001.
Hand Held 200 Khz Digital Multimeter. MAKE- FLUKE/ YOKOWAGA or similar. SPECIFICATION ALSO ATTACHED AS ANNEXURE A.
Horizontal Lever for BOBRN Wagon to RDSO Drg NO WD-89007-S-71, Alt 6,Item No. 1(Including corresponding nylon bushes to RDSO Drg.No.WD-91071-S-69, ALT-11 in assembled condition) Material for Horizontal lever : IS:2062 E250A with Cu and for bushes: Nylon-66.
Construction of Rest House for Track Machine staff and allied works at BVR, DRU &TTR SW-I:- Rest house for Track machine staff ( Drg No. M/MYS/439/2008)SW-II: Provision of PF shelterSW-III:-Path way 1.5 wide( 2 Nos x 300 length x 1.50 wide )SW-IV:- Approach road for loading area( 150 m x 3.5 wide )SW- V:- Drilling of Borewell and storage tankSW-VI:-ADEN/SMET Sub Div: Painting of Rail Barricading and Height Gauges in RRB-TLGP and DRU-CMGR sectionsSW-VII:- Interlocking of Maned L C Gates Nos. 68, 72, 77 & 82 in YPR-ASK section - Provision of Buildings - 4 Nos (17.60m x6.40m)SW VIII:-Construction of Overhead Tank of Capacity 2.50 Lakh Litres at Birur Station ( left Over Works)
Cleaning solvent Orion 5017 or equivalent as per RDSO Maintenance Instruction No- MP.MI-15 (Rev-13), May-23
Supply and installation of Circuit Breaker and its accessories enclosed in junction box.
Secunderabad Division Electrical Maintenance Department - (i) Yadlapur : Raising of Platforms to High Level and Provision of New 3m FOB at Yadlapur (ii) Chegunta : Raising of Platforms to High Level and Provision of New 3m FOB at Chegunta Station. (iii) Sampurahalli : Raising of Platforms to High Level at Sampurahalli Halt Station. (iv) Thangundi : Raising of Platforms to High Level and Provision of New 3m FOB at Thangundi Station. (v) Chiksugar : Raising of Platforms to High Level and Provision of New 3m FOB - Electrical arrangements.
STAAD Pro Perpetual License with 3 years forward SELECT Subscription (AMC) as per annexure enclosed.