Loading…
Loading…
5,024 results • Latest
HIGH PRESSURE GAUGE
Professional Large Format Display (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Revolving Chair (V5) (Q2)
Charge Amplifier Unit-9 Channel
Wall Clocks (Battery Operated) (V2) Conformingto IS12510 (Q4)
Centrifuge Machine, 32 x 15ml Angle rotor, 8 x 50 ml Angle rotor
VACUUM CHAMBER
Accessories (Welding torches) for EWM Tetrix welding machines
ORGAN ON CHIP MICROFLUIDICS
Nitrile Coated/Nitrile Hand Gloves (V2) (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Non Comprehensive AMC for LSSF Control Systems; Non Comprehensive AMC for LSSF Control Systems; Buyer
SUPPLY OF DEBURING TOOLS AND ACCESSORIES AS PER
THERMAL INSULATION COUPLINGS
Lasermarkingmachine (Q3)
2/2 WAY CRYOGENIC SOLENOID VALVE OF1/4 INCH SIZE WITH 4.5MM ORIFICE, 2/2 WAY CRYOGENIC SOLENOID VALVE OF 1/8 INCH SIZE WITH 4.5MM, 2/2 WAY CRYOGENIC SOLENOID VALE OF 1/4 INCH SIZE WITH 3MM ORIFICE, 2/2 WAY CRYOGENIC SOLENOID VALVE OF 1/8 INCH SIZE WITH 3MM ORIFICE
CPCI BASED DPU CHECKOUT
IBR CERTIFIED INVERTED BUCKET STEAM TRAP
12V SMPS FOR BATTERY TEST SYSTEMS
MEASUREMENT NEEDLE -04, FILAMENT -04
PolarFire SoC FPGA Video Kit, Microsemi SmartFusion2 security Evaluation Kit
NC AMC FOR DIGITAL CONTROL SYSTEM OF VDS
Plastic Jerrycans (Q3)
Markersand Highlighters (Q4)
Custom Bid for Services - CALIBRATION AND OVERHAUL OF YANTRIKA MAKE DEAD WEIGHT TESTER, Custom Bid for Services - ONE TIME MAINTENANCE AND REPLACEMENT OF SCREW PUMP Similar Category Calibration Services Repair, Maintenance and Installation of Plant Systems/Equipments
Alloy Rods and Blocks
silicon O rings
Dslr/Compact/Handheld Camcorder Or Video Cameras (V2) (Q2) (PACOnly)
Analog Transceiver-Handheld (Q2)
Pneumaticimpactwrenches (Q3) (PACOnly)
LED Batten Light (LEDTube Light) (V2) (Q2)
Pedestal Safety Lock (Q3)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Augmentation of Fire water pump house with GLR Construction of 825 CUM GLR and Pump House at SMPC U II, SDSC SHAR.
Queuemanager (Q3)
Commercial Idli Steamer (Q3)
RATE CONTRACT for carrying out sporadic nature of MATERIAL HANDLING
RAIL MOUNTING SOCKET
Seamless Carbon Steel Pipes of Various Sizes
THERMOCOUPLE CABLES
NORMALLY CLOSED CONTROL VALVE
Humidity Controlled Storage Cabinets
Supply of Recirculating Water Chiller
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local
Heat Treatment and Testing of Al Alloys
SUPPLY OF 03 INDUSTERIAL PC/MINI PC
Heavy Duty Storage Racks (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
AM Grade Inconel 718 Powder for Laser Power DED Application
Gas block assembly for TOC (Part no. TOC LCPH)
SOURCE MEASURE UNIT(SMU)
DUAL-CHANNEL PICOAMMETER