Loading…
Loading…
5,028 results • Latest
Periodical Painting for Internal plastered surfaces of low bay and high bay of Casting facility -01 at Unit-02, SMPC, SDSC SHAR.
Internal and external painting of: i. Agni Motor preparation facility ii. Block house and iii. MFL / 2B load cell calibration labs at SMP/ETF and paintings internal and external plastered surfaces of building nos. 116 and 117 an External and internal painting of Magazine building no.152 at SMPC Unit-1, SDSC SHAR.
Painting external surfaces of SR, SCOF and Control centre building at Zero point, SDSC SHAR.
Refurbishment of fencing all round the SHAR Sub_station and Refurbishment of Chain link fencing all round 132kV Substation at SMPC unit 1, SDSC SHAR.
Periodical Painting of external surface of Technical Service Building /TSB/ at SDSC SHAR.
Repairs to Road side berms connecting between Bldg. 133 and 134 at SMPC Unit 1 /SPROB Area/ SDSC SHAR.
Civil Repairs /Replacement of Roof sheets, Structural Steel frame works and miscellaneous civil works/ for Open Air Auditorium in PCN Colony, Sullurpeta
Cartridge 1, Cartridge 2, Cartridge 3, Cartridge 4, Cartridge 5, Cartridge 6, Cartridge 7, Cartridge 8, Cartridge 9, Cartridge 10, Cartridge 11, Cartridge 12, Cartridge 13, Cartridge 14, Cartridge 15, Cartridge 16, Cartridge 17, Cartridge 18, Cartridge 19, Cartridge 20, Cartridge 21, Cartridge 22, Cartridge 23
Calibration Services - Calibration maintenance of liquid borne particle counters; Calibration maintenance of liquid borne particle counters; Calibration maintenance of liquid borne particle counters; Buyer premises (onsite)
Allopurinol Tablets (V2) (Q2)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2)
Dialtestindicator (Q3)
Polythene sheet
Stationery Scissors (V2) Conformingto IS989 (Q4)
Permanent Paint Marker (V3) (Q4)
Polymethyl Methacrylate (PMMA) (Acrylic) Sheets (V2) asper IS14753 (Latest) (Q3)
Industrialcompositecolor3D Printer (Q2)
Register (V2) (Q4)
Pneumaticimpactwrenches (Q3)
Metal Storage Cabinet (Q2)
Supply of stainless steel flexible hose
SOLDER BAR 60% TIN 40% LEAD
Thread Plug and Ring Gauges
fabrication and supply of tube clamps
Computer Monitor (V2) (Q2)
REMOTE ACCESS & SUPPORT SOFTW ARE (Q3) (PACOnly)
SPARES FOR ELECTROSPINNING MACHINE
A3 Size Multifunction Printer (MFP) (Q2)
Octamethylcyclotetrasiloxane
Custom Bid for Services - Non -comprehensive of Weighing balance Similar Category AMC/CAMC of Hydro Energy Power Plants AMC/CAMC of Solar Energy Power Plants Customized AMC/CMC for Pre-owned Products
Executive Table (V4) (Q2), Wooden Shelf/Case/Rack Credenza/Modular Storage (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7018789 Dated : 07-01-2026 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Executive Table (V4) Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Structural repair works for Security Watch Towers No 13 14 18 and Structural repair works for Security Watch Towers No 08 10 11 and Certain civil maintenance works in battery preparation room in annexure building of SP2B and Structural rehabilitation cum special repair works at SP2B AC Plant SLP SDSC SHAR
Arresting roof leakages by providing PU coating and external wall dampness problems by sand faced plastering in all types of Qtrs /70 nos/ in PHC-I area, SDSC SHAR.
Arresting water leakage and other civil repair works of 15m height over head tank /OHT/ near VALF Admin building at SMP / ETF area and Construction of Engineers room at S200 Hardware Storage Building SHSB at SMP / ETF and Civil Renovation works to engineers room, Technician room and toilets in 6C Building at SMP / ETF area, SDSC SHAR.
Re-surfacing of existing road from Kudiri Village to Davadigunta /SHAR _ Sullurpeta Road/ at Sullurpeta.
Providing security track along the compound wall at Pallavaram / Providing wall paneling for Reception room at Pallavaram Guest house / Miscellaneous civil works in office Room at Pallavaram Guest house, Chennai.
Providing 2 nos. of security room of size 2m x 2m at South security track entry point and visitors gallery entrance at SDSC SHAR.
Replacement of damaged Acoustic carpet at LCC, Zero Point, SDSC SHAR.
Restoration of collapsed RR masonry compound wall with RCC wall at Pallavaram Guest House, Chennai.
Repairs to sunken flooring in dining and entrance lobby area at Canteen Building, Unit-1, SMPC, SDSC SHAR
AMC Annual Maintenance Contract for operation and maintenance of water supply, sewage disposal, Civil and PH works at PHC I housing colonies, Guest houses, Godavari Dining Hall, Media Centre, TSB, CISF Barracks, CISF office, CL colony, etc., including periodical checking, readiness, replacement of sanitary and PH fittings in Guest House complex for the year 2026-27 /one year/ SDSC SHAR.
Arresting roof leakage by providing PU coating for Kalpana Guest House, SDSC SHAR and Arresting roof leakages by providing PU Coating and External wall dampness problems by Sand faced plastering in 90 nos of Qtrs at PHC-I, SDSC SHAR.
Arresting roof leakages High bay and low bay of Vibration test facility Building /Building No: 04/ at SMP and ETF Area and Arresting roof leakage of PSPF Building VALF, STEX Area, SDSC SHAR.
Repair works and Periodical painting works of main overhead tank at System II and Repair to arrest water leakages in curing pit by using high strength Polyurethane injection Resin in Building No.117 /Curing facility/ and Repairs to arrest water leakage in casting pit of Agni casting facility by using high strength polyurethane injection resin in Building No. 142, SMPC Unit 1, SDSC SHAR.
Certain miscellaneous civil works in the Electrical Sub-stations at Hospital, Guest House, PHC I and PHC II area and Periodical painting of internal and external surfaces of media centre building at PHC II, SDSC SHAR.
Replacement of damaged PVC Flooring with vitrified tile flooring in room nos:1, 5, 7, 9, 11, 12, 13 and 14 providing false ceiling in Room nos 02, 03 and corridor in SR Building, Zero Point, SDSC SHAR.
Providing BT topping to approach road and Parking area of Admin Complex, Keepakam, SDSC SHAR.
Deployment of JCB for clearing obstructions in Fire Lanes and other miscellaneous works at various areas of SDSC SHAR