Loading…
Loading…
5,038 results • Latest
Customized AMC/CMC for Pre-owned Products - X-BIS MACHINE; TimeWatch; Comprehensive Maintenance Contract (CMC); QUARTERLY; No
File/Folder (V3) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Silvaco TCAD semiconductor process and device simulation software package three year license
Palladium (II) chloride anhydrous extra pure for synthesis
PRIMER FOR CTG 5.56MM FLG
Fixed Computer Workstation (Q2)
Linemark Non Magnetic White Dry Erase Writing board of, Linemark Non Magnetic White Dry Erase Writing board of dimensions (in mm) 600 x 900
Milton 2 Litre Rated Capacity of Electric Kettle
ajanta Quartz Wall Clock of Size 16"
LENDRA Pulse Oximeter , Finger Tip
amiciSense Plastic Temperature sensor, No of pins 4
Unbranded Rotameter 12 month 5.5-55 NM3/hr
MITUTOYO Flat Spindle End Internal Micrometer
Upcycled Lanyards (V1) (Q3)
Manufacture and Supply of AA2014-T651/52 rings: OD710 x ID545 x Ht 75mm - 25 nos
AA2014 T651 or 52 rings
SENSA CORE Electrolyte Analyzer
Fabrication & Fixing of Aluminium Partition
Operating System Software (V3) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Electric Heater
Centrifugal Exhaust System
Supply of Half-loop flexures for Electrodyanamic Shaker
Computer Table (V3) (Q2)
Tender for Digital ICs
Layer 2 Access Switch (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
P Type silicon wafer
Gaseous Helium 99.995% in quads
Single-mode fiber at 810nm, Single-mode fiber at 1550 nm
Linear Low Density Polyethylene (LLDPE) Film (V3) Conformingto IS14500 (Q3)
Books (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Propeller Type AC Ventilating Fans (Exhaust Fan) (V3) Conforming To IS 2312 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
PFA vials 15 ml capacity with cap as per attached specifications, PFA Vials 7 ml capacity with cap as per attached specifications, PFA beaker 50 ml capacity as per attached specifications
EM GRADC DC DC CONVERTER
Security Seal Stickers as per Annexure, A4 size Govt. of India Stickers as per Annexure, Handle with care Stickers as per Annexure, Fragile Sticker Stickers as per Annexure, Side up Stickers as per Annexure
hp High End Desktop Computer with Warranty 3 Year
Providing Additional Storage area at LTET area of LPSC Valiamala
CONVERTORS as per attached specifications
Custom Bid for Services - EARTH FILLING AND LEVELING WORK AT APEP, ALUVA Similar Category Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis)
CONSUMABLES FOR Elemental Analyser
Iris Diaphragm– 25mm, Iris Diaphragm– 12mm, Rigid Lens Mount
Dibutyl tin dilaurate
Composite Office Tables confirming to IS 8126 (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7072920 Dated : 07-01-2026 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 62 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DEPUTY REGISTRAR ( FINANCE), GRADE - I Indian Institute of Space Science and Technology, Dept. of Space, Govt. of India, Valiyamala, Thiruvananthapuram - 695547 (Deputy Registrar, Finance - Grade - I)
Unbranded Automatic Galvanized Ultra-Sonic Bath Sonicator,, Unbranded Automatic Galvanized Ultra-Sonic Bath Sonicator, Capacity 6 liter
BRUSH UP Round Shape Toilet Brush
ZOLFIN Cotton Flannelette duster of Size 12 x 16 inches
Goods Transport Service – Per Trip based Service - Machinery & Equipment, Fragile, Valuable goods requiring High Security; Flatbed Truck; 20FT