Loading…
Loading…
4,837 results • Latest
Custom Bid for Services - Supply of Diesel Exhaust Fluid for one year Similar Category Refilling of Industrial Gases in Cylinders
Cotton Canvas Hand Gloves (SAIL) (Q3)
Layer 3 - Access Switch (Q2), Layer - 3 Core Switch (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6798864 Dated : 24-10-2025 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Layer 3 - Access Switch Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 64 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Accounts Officer, URSC U R Rao Satellite Centre, Department of Space, indian space research organization, Department of Space (Accounts Officer, Ursc)
Custom Bid for Services - CUSTOM BID FOR FABRICATION OF FIRE HYDRANT SYSTEM Similar Category Piping Erection Service Operation And Maintenance Of Fire Fighting System Repair, Maintenance and Installation of Plant Systems/Equipments
Benchtop Digital Multi-Meter- 8.5 Digital Accuracy as per attached specifications
Storage and Transport cases
Brady Handheld Based / Battery Operated Label Printer
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SUPPLY OF VIDEO CONFERNCING SYSTEM MAKE-CISCO
Turnkey Audio-Visual (AV) System for Conference Room
functiongenerator (Q3)
high performance power supplies (Q3) ( PAC Only ) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Fiber Rope (Polypropylene) ISImarkedto IS5175 (Q2)
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
highperformancepowersupplies (Q3) (PACOnly)
Multichannel Programmable DC Power supply as per attached specifications
Digital Multimeter (Q3)
Manual XYZ Translation Stage as per attached specification
Operation And Maintenance Of Other Machines And Plants - Complete System
LED Luminaire For Floodlight Conforming To IS10322 (Part5/Section5) (V3) (Under BISScheme-II) (Q2)
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
Caution/Crime Scene Tape (V2) (Q4)
2 way power divider/combiner
LABVIEW PROFESSIONAL DEVELOPMENT SYSTEM AS PER THE ATTACHED SPECIFICATIONS
Firewall (V3) (Q2) (PACOnly)
Ultra High Resolution High Speed Cameras and its Accessories
Spares for Flexpro Make Flame Proof Electrical systems
Supply and installation of Timer for Split-AC units
Online UPS (?10KVA) With Battery Conforming To IS16242 (Part1) (Q2)
Mass Flow Controllers (Q3)
Copper Tubing, Outside Dia. -¼ ” ( 3 kilogram ), Delivery Days Copper Tubing, Outside Dia. - 3/8” ( 5 kilogram ), Copper Tubing, Outside Dia. - 1/2” ( 7 kilogram ), Copper Tubing, Outside Dia. - 5/8” ( 9 kilogram )
CRANE WEIGHING SCALE 3 TON CAPACITY, CRANE WEIGHING SCALE 10 TON CAPACITY, CRANE WEIGHING SCALE 5 TON CAPACITY
Augmentation of Biometric Access Control Systems
LVDT SMPLEX+/-125 MM STROKE
Galvanized Steel Barbed Wirefor Fencing (V3) ISImarkedto IS278 (Q3)
Electronic Mail (E-Mail) and Messaging Software (V2) (Q2)
highperformancepowersupplies (Q3)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2)
Electroless Plating Chemicals
SULPHURIC ACID, GRADE AR, ACIDITY: MIN 98.0%
Servers (V2) (Q2)
Refillable Seamless Steel Gas Cylinders (Q3)
Bicyclewith Safetyand Performance Requirements Conformingto IS10613 (Q2)
Digital Multimeter (Q3)
PNEUMATIC CONTROL GLOBE VALVE
Bathing Soap Bar (V3) Conforming to IS 13498 (Q4) ( PAC Only ) (3 (3 ))
Ultrasonic Cleaner With Digital Timer
Portable Vibration Meter/Tester