Loading…
Loading…
7,287 results • Recent activity
Design Engineering Supply Manufacture Fabrication Installation Testing and Commissioning of Vapour Recovery System and Allied Works at 5 POL locations of IOCL
Balance Mainline Laying Works Including Laying 36IN OD 4.5 KM Approx Total Length Cross Country Crude Oil Pipeline in Different Stretches in Site3 of Group5 from Ch. 1023.491 KM to 1063.450 KM Ex Mundra Under New Mundra Panipat Pipeline Projec
Supply of Jockey pump and installation of Fire Engine at Palam AFS under Delhi and Haryana State office.
Design Engineering Supply Manufacture Fabrication Installation Testing and Commissioning of Vapour Recovery System and Allied Works at 5 POL locations of IOCL
Custom Bid for Services - 9050C26A06 Health Assessment of wrapping/coating of U/G lines by using CAT (Current Attenuation Test) and DCVG (Direct Current Voltage Gradient) survey at Mathura Refinery Similar Category Hiring of Third-Party Inspection Agency
Design Engineering Supply Manufacture Fabrication Installation Testing and Commissioning of Vapour Recovery System and Allied Works at 5 POL locations of IOCL