Loading…
Loading…
7,271 results • Latest
Unbranded Grade A Rolled Copper Strip Rolled Copper and Copper, Unbranded Grade A Rolled Copper Strip Rolled Copper and Copper Alloy Sheet , Strip and Foil, Length 1 Metre
Custom Bid for Services - RATE CONTRACT FOR CABLE FAULT IDENTIFICATION AT IOCL BONGAIGAON REFINERY Similar Category Electric Cabling Service Support Services Operation And Maintenance Of Electro-Mechanical Installations
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Paradip Refinery; 9070C25C92 Lining up an agency for Expert supervision services during capital maintenance, overhauling, normal maintenance and troubleshooting of M/s V..
Customized AMC/CMC for Pre-owned Products - LPG Pump; M/S Kirloskar Ebara Pumps Limited; Annual Maintenance Contract (AMC); Six-Monthly; No
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7152742 Dated : 27-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Required No