Loading…
Loading…
1,342 results • Recent activity
Providing the Services of Manpower (i.e. Computer Operators, Multi-Tasking Staff and Sweepers) in the office of Executive Engineer CD-VI for the period of 3 Months.
Removal of obstruction / waste materials etc. from Toe drain along R.M.E. from RD 3240 M to RD 0 M and extended portion from Baba colony road to Burari regulator in the length of 500 M and 260 m along Baba colony road and disposal of same at MCD du
Removal of obstruction / waste materials etc. from Link drain No. II RD 0 M to RD 1190 M, 155 m along Supplementary drain( Sangam Vihar, Gali No.1) and disposal of same at MCD dumping point for the year 2026-27.
Cleaning and removal of Malba / Waste Matarial / Obstructions from Burari Creek drain from RD 0 m to RD 6500 m, RD 6900 m to RD 8863 m and New Course from RD 0 m to RD 600 m and disposal of the same to any authorized ILFS plant dumping site to mainta
Removal of obstruction / waste materials etc. from Burari drain RD 2280 M to RD 6038 M and Cleaning of jungle from RD 0 M to RD 2280 M and disposal of same at MCD dumping point for the year 2026-27.
Restoration / Repair of the Existing Foot-Over Bridge at RD 160 m of Jahangirpuri Drain Damaged during the Flood Season 2025.